23.03.2014 Views

ordinary meeting of council to be held on tuesday, 18 july 2006

ordinary meeting of council to be held on tuesday, 18 july 2006

ordinary meeting of council to be held on tuesday, 18 july 2006

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>18</strong> July <strong>2006</strong> 3 / 65<br />

15 TO 19 TURRAMURRA AVENUE AND 1 TO<br />

1A WONGA WONGA STREET, TURRAMURRA<br />

Item 3<br />

DA0068/06<br />

7 July <strong>2006</strong><br />

The following certificati<strong>on</strong> sheets must <str<strong>on</strong>g>be</str<strong>on</strong>g> accurately completed and attached <str<strong>on</strong>g>to</str<strong>on</strong>g> the<br />

certificati<strong>on</strong>:<br />

- Rainwater retenti<strong>on</strong> certificati<strong>on</strong> sheet c<strong>on</strong>tained at appendix 13 <str<strong>on</strong>g>of</str<strong>on</strong>g> Water Management<br />

DCP 47<br />

- On-site detenti<strong>on</strong> certificati<strong>on</strong> sheet c<strong>on</strong>tained at appendix 4 <str<strong>on</strong>g>of</str<strong>on</strong>g> Water Management<br />

DCP 47.<br />

126. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the Occupati<strong>on</strong> Certificate a registered surveyor must provide a Works-as-<br />

Executed (WAE) survey <str<strong>on</strong>g>of</str<strong>on</strong>g> the completed s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmwater drainage and management systems. The<br />

WAE plan(s) must <str<strong>on</strong>g>be</str<strong>on</strong>g> submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Principal Certifying Authority for approval prior <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the Occupati<strong>on</strong> Certificate. The WAE survey must indicate:<br />

- As built (reduced) surface and invert levels for all drainage pits.<br />

- Gradients <str<strong>on</strong>g>of</str<strong>on</strong>g> drainage lines, materials and dimensi<strong>on</strong>s.<br />

- As built (reduced) level(s) at the approved point <str<strong>on</strong>g>of</str<strong>on</strong>g> discharge <str<strong>on</strong>g>to</str<strong>on</strong>g> the public drainage<br />

system.<br />

- As built locati<strong>on</strong> and internal dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> all detenti<strong>on</strong> and retenti<strong>on</strong> structures <strong>on</strong> the<br />

property (in plan view) and horiz<strong>on</strong>tal distances <str<strong>on</strong>g>to</str<strong>on</strong>g> nearest adjacent boundaries and<br />

structures <strong>on</strong> site.<br />

- The achieved s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage volumes <str<strong>on</strong>g>of</str<strong>on</strong>g> the installed retenti<strong>on</strong> and detenti<strong>on</strong> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rages and<br />

derivative calculati<strong>on</strong>s.<br />

- As built locati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> all access pits and grates in the detenti<strong>on</strong> and retenti<strong>on</strong> system(s),<br />

including dimensi<strong>on</strong>s.<br />

- The size <str<strong>on</strong>g>of</str<strong>on</strong>g> the orifice or c<strong>on</strong>trol fitted <str<strong>on</strong>g>to</str<strong>on</strong>g> any <strong>on</strong>-site detenti<strong>on</strong> system.<br />

- Dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> the discharge c<strong>on</strong>trol pit and access grates.<br />

- The maximum depth <str<strong>on</strong>g>of</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage possible over the outlet c<strong>on</strong>trol.<br />

- Top water levels <str<strong>on</strong>g>of</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage areas and indicative RL’s through the overland flow path in<br />

the event <str<strong>on</strong>g>of</str<strong>on</strong>g> blockage <str<strong>on</strong>g>of</str<strong>on</strong>g> the <strong>on</strong>-site detenti<strong>on</strong> system.<br />

The WAE plan(s) must show the as-built details above in comparis<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> those shown <strong>on</strong> the<br />

drainage plans approved with the C<strong>on</strong>structi<strong>on</strong> Certificate prior <str<strong>on</strong>g>to</str<strong>on</strong>g> commencement orf works.<br />

All relevant levels and details indicated must <str<strong>on</strong>g>be</str<strong>on</strong>g> marked in red <strong>on</strong> a copy <str<strong>on</strong>g>of</str<strong>on</strong>g> the Principal<br />

Certifying Authority stamped c<strong>on</strong>structi<strong>on</strong> certificate s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmwater plans.<br />

127. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> occupati<strong>on</strong>, issue <str<strong>on</strong>g>of</str<strong>on</strong>g> an Occupati<strong>on</strong> Certificate or issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the Final Compliance<br />

Certificate (and at the completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> works), the applicant shall submit for approval by the<br />

Principal Certifying Authority (PCA) certificati<strong>on</strong> from a suitably qualified and experienced<br />

civil engineer, that:<br />

a. Footings, and any required permanent excavati<strong>on</strong> or drainage easement support, have<br />

<str<strong>on</strong>g>be</str<strong>on</strong>g>en c<strong>on</strong>structed in accordance with the c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> this C<strong>on</strong>sent relating <str<strong>on</strong>g>to</str<strong>on</strong>g> footings<br />

and excavati<strong>on</strong> adjacent <str<strong>on</strong>g>to</str<strong>on</strong>g> drainage easements and/or drainage pipes, and<br />

b. Footings allow for complete future excavati<strong>on</strong> over the full width <str<strong>on</strong>g>of</str<strong>on</strong>g> the easement <str<strong>on</strong>g>to</str<strong>on</strong>g> a<br />

depth <str<strong>on</strong>g>of</str<strong>on</strong>g> the invert <str<strong>on</strong>g>of</str<strong>on</strong>g> the pipe, without the need <str<strong>on</strong>g>to</str<strong>on</strong>g> support or underpin the subject<br />

structure.<br />

N:\0607<strong>18</strong>-OMC-PR-03482-15 TO 19 TURRAMURRA AVENU.doc/murphy/65

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!