OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Sec. 4.4.2.3 Access Tunnels <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 4.4.2.4 Emplacement<br />

Rooms<br />

Sec. 4.4.3.3 Communications<br />

System<br />

Sec. 4.5 Waste <strong>to</strong> be Placed<br />

in <strong>the</strong> DGR<br />

Environmental Impact Statement (00216-REP-07701-00001 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

Provides clarification on location of<br />

portable refuge stations<br />

Provides clarification on use of<br />

refuge stations<br />

Provides additional information on<br />

placement of waste within <strong>the</strong> two<br />

panels of <strong>the</strong> DGR<br />

Provides clarification on use of<br />

access tunnels as a means of<br />

secondary emergency egress<br />

Design update Updates emplacement rooms<br />

dimensions<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on<br />

emplacement rooms design<br />

Provides clarification on emergency<br />

egress via personnel access doors<br />

placed in each emplacement room<br />

end-wall<br />

Provides clarification on location of<br />

hard-wired emergency phones<br />

underground<br />

Provides clarification on alternative<br />

means of dealing with combustible<br />

waste<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-03-60 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-60 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-03-62 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-60 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

Item #2 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-03-61 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-60 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-59 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-03-50 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

608<br />

608<br />

608<br />

608<br />

336<br />

608<br />

608<br />

608<br />

608<br />

Page 9 of 138<br />