OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Sec. 6.3.8.2 Ventilation System<br />

Capacity<br />

Fig. 6-20 Underground<br />

Ventilation<br />

Distribution System<br />

Preliminary Safety Report (00216-SR-01320-00001 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on estimated<br />

airflow requirements<br />

Design update Updates configuration of<br />

underground services area<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 6.3.8.5 Exhaust Fans <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 6.3.10.4 Underground<br />

Dewatering<br />

Sec. 6.4 DGR Waste<br />

Package Inven<strong>to</strong>ry<br />

Sec. 6.5.2.2 Groups A, B, C and<br />

D<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Undertakings<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Revises number of permanent refuge<br />

stations<br />

Provides clarification on location of<br />

main exhaust fans<br />

Provides clarification and additional<br />

information on underground<br />

dewatering system for DGR<br />

operation<br />

Provides additional information on<br />

predicted water inflows<br />

Provides additional information on<br />

preliminary estimate of groundwater<br />

inflow<br />

Provides clarification on categories of<br />

L&ILW <strong>to</strong> be placed in <strong>the</strong> DGR<br />

Design update Updates design description of<br />

electrical power reels<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-35 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

Item #1 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-09 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-14 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-19 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-04-151 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />

Letter dated Sep.28, 2012 [13]<br />

<strong>Response</strong> <strong>to</strong> Undertaking TIS 11<br />

from Jul.18 Technical Information<br />

Session #1 in OPG Letter dated<br />

Aug.15, 2012 [9]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-04-102 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />

Letter dated Aug.27, 2012 [10]<br />

Item #3 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

363<br />

336<br />

363<br />

363<br />

363<br />

Page 85 of 138<br />

New<br />

�<br />

692 �<br />

704 �<br />

336