05.01.2013 Views

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Fig. 1.1 Proposed Layout of<br />

<strong>the</strong> DGR below <strong>the</strong><br />

Bruce Nuclear Site<br />

Sec. 2.1 Shaft Sinking <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 2.2 Lateral<br />

Development<br />

Fig. 2.5 Isometric View of<br />

Underground DGR<br />

Level<br />

Fig. 2.6 DGR Layout<br />

Showing Location<br />

of Proposed<br />

Verification<br />

Activities<br />

Geoscientific Verification Plan (NWMO DGR-TR-2011-38 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

Design update Updates configuration of underground<br />

services area<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification regarding controlled<br />

drill and blast techniques for shaft sinking.<br />

Fur<strong>the</strong>rmore provides information regarding<br />

excavation performance moni<strong>to</strong>ring of shaft<br />

sinking<br />

Provides clarifications on reliability of site<br />

characterization methods during lateral<br />

development<br />

Design update Updates configuration of underground<br />

services area<br />

Design update Updates configuration of underground<br />

services area<br />

Item #1 (i.e., Fig. 6-7 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-57 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-02-37 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #2<br />

Letter dated Jun.1, 2012 [4]<br />

Item #1 (i.e., Fig. 6-6 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

Item #1 (i.e., Fig. 6-7 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

336<br />

608<br />

523<br />

336<br />

336<br />

Page 133 of 138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!