Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />
Section/Figure/Table in<br />
Document<br />
Appendix A,<br />
Table 5a<br />
Appendix A,<br />
Table 5b<br />
DGR EA Follow-up Moni<strong>to</strong>ring Program (NWMO DGR-TR-2011-10 R000)<br />
Radiological<br />
Regula<strong>to</strong>ry<br />
Moni<strong>to</strong>ring Program<br />
– Site Preparation<br />
and Construction<br />
Radiological<br />
Regula<strong>to</strong>ry<br />
Requirements<br />
Moni<strong>to</strong>ring Program<br />
– Operations<br />
Information Type Scope of New Information Information Source CEAA<br />
Registry<br />
Item<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Provides clarification on underground<br />
radiological moni<strong>to</strong>ring (air, water)<br />
Provides clarification on moni<strong>to</strong>ring of<br />
tritium during construction<br />
Provides clarification on underground<br />
radiological moni<strong>to</strong>ring (air, water)<br />
Provides additional information<br />
regarding <strong>the</strong> adequacy of <strong>the</strong><br />
radiological environmental moni<strong>to</strong>ring<br />
program in light of <strong>the</strong> DGR<br />
radionuclide inven<strong>to</strong>ry<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-23 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
Submission of supplementary<br />
material <strong>to</strong> IR Package #1<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-01-01<br />
Letter dated Jul.10, 2012 [6]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-23 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-03-67 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />
Letter dated Jul.9, 2012 [5]<br />
363<br />
606<br />
363<br />
608<br />
Page 70 of 138<br />