OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Fig. 2.1 DGR Underground<br />

Layout<br />

Fig. 2.3 Ventilation during<br />

Construction<br />

Fig. 4.2 DGR Layout with<br />

Ventilation Path of<br />

Radon<br />

Concentration<br />

Analysis<br />

Table 4.3 DGR Properties by<br />

Location<br />

Radon Assessment (NWMO DGR-TR-2011-34 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

Design update Updates configuration of underground<br />

services area<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on estimated airflow<br />

requirements<br />

Design update Updates configuration of underground<br />

services area<br />

Item #1 (i.e., Fig. 6-6 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-35 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

Item #1 (i.e., Fig. 6-7 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

Design update Updates tunnels and room dimensions Item #2 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

336<br />

363<br />