OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Sec. 4.7.4.2 Reposi<strong>to</strong>ry<br />

Construction<br />

Sec. 4.7.5 Construction Waste<br />

Management<br />

Sec. 4.7.5.2 Hazardous<br />

Materials<br />

Sec. 4.7.5.3 Waste Rock<br />

Management<br />

Environmental Impact Statement (00216-REP-07701-00001 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

<strong>Response</strong> <strong>to</strong><br />

Undertakings<br />

<strong>Response</strong> <strong>to</strong><br />

Undertakings<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 4.7.5.4 Water Management <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides additional information on<br />

ground improvement approaches for<br />

shaft collar and shaft sinking<br />

activities<br />

Provides additional information on<br />

<strong>the</strong> <strong>to</strong>tal weight of ammonia nitrate<br />

that would be used per sequenced<br />

shaft blast<br />

Provides additional information on<br />

<strong>the</strong> <strong>to</strong>tal weight of ammonia nitrate<br />

that would be used per sequenced<br />

shaft blast<br />

Provides clarification on <strong>the</strong><br />

estimated range of annual output of<br />

grey water and <strong>the</strong> estimated waste<br />

rock volume<br />

Provides additional information<br />

regarding s<strong>to</strong>rage of explosives<br />

Provides additional information on<br />

options for waste rock management<br />

Provides clarification on <strong>the</strong><br />

calculations, assumptions and<br />

confidence limits of <strong>the</strong> estimates for<br />

maximum excavation discharge and<br />

sump water pumping<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-31 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> Undertaking TIS 3<br />

from Jul.18 Technical Information<br />

Session #1 in OPG Letter dated<br />

Aug.15, 2012 [9]<br />

<strong>Response</strong> <strong>to</strong> Undertaking TIS 3<br />

from Jul.18 Technical Information<br />

Session #1 in OPG Letter dated<br />

Aug.15, 2012 [9]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-29 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-01-02 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-02-34 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #2<br />

Letter dated Jun.1, 2012 [4]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-04-101 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />

Letter dated Sep.28, 2012 [13]<br />

363<br />

Page 12 of 138<br />

New<br />

692 �<br />

692 �<br />

363<br />

363<br />

523<br />