05.01.2013 Views

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Fig. 4.8.3-1 Typical<br />

Emplacement<br />

Room<br />

Configuration for<br />

LLW<br />

Fig. 4.8.3-2 Typical<br />

Emplacement<br />

Room<br />

Configuration for<br />

ILW<br />

Sec 4.8.5.4 Water Management <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 4.8.7.10 Emergency<br />

Preparedness and<br />

Emergency<br />

<strong>Response</strong> Program<br />

Environmental Impact Statement (00216-REP-07701-00001 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

Provides additional information on<br />

predicted water inflows<br />

Design update Updates emplacement room<br />

dimensions<br />

Design update Updates emplacement room<br />

dimensions<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 4.10.1 Design Changes <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 4.10.2 Additional<br />

Emplacement<br />

Rooms<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on effect of<br />

s<strong>to</strong>rmwater management pond on<br />

groundwater quality, provision for<br />

prolonged retention and deployment<br />

of water treatment<br />

Provides clarification on mine rescue<br />

support during operation<br />

Provides clarification of expansion<br />

potential<br />

Provides clarification regarding DGR<br />

extension plans<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-04-151 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />

Letter dated Sep.28, 2012 [13]<br />

Item #2 (i.e., Fig. 6-17 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

Item #2 (i.e., Fig. 6-18 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-03-56 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-61 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-04-145 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />

Letter dated Sep.28, 2012 [13]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-04-120 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />

Letter dated Sep.6, 2012 [11]<br />

336<br />

336<br />

608<br />

608<br />

Page 13 of 138<br />

New<br />

�<br />

�<br />

725 �

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!