OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

OPG’s DGR for L&ILW Project Requirements (DGR-PDR-00120-0001 R002)<br />

Sec. 5.0 Design Limits <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 19.0 Regulations, Codes<br />

and Standards<br />

Sec. 19.2 Building and<br />

Structures<br />

Sec. 19.3 Fire Protection<br />

System<br />

Sec. 19.4 Pressurized<br />

Systems<br />

Sec. 23.0 Technical<br />

References<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification of expansion<br />

potential<br />

Provides additional information on<br />

human fac<strong>to</strong>rs standards, criteria,<br />

guidelines applicable <strong>to</strong> design<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-04-145 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />

Letter dated Sep.28, 2012 [13]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-11 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

Updates edition of NBCC <strong>Response</strong> <strong>to</strong> IR-LPSC-01-01 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

Updates edition of NBCC and<br />

National Fire Code<br />

Changes “CSA N285-08” <strong>to</strong> “CSA<br />

N285-08 with updates”<br />

Updates edition of NBCC for<br />

Reference R-5<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-02 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-04 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-01 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

363<br />

363<br />

363<br />

363<br />

363<br />

Page 128 of 138<br />