OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />
Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />
Section/Figure/Table in<br />
Document<br />
Fig. 3.5 DGR Base Case<br />
Layout<br />
Fig. 3.6 Underground<br />
Services Area<br />
Fig. 5.2 Shaft Services Area<br />
Showing <strong>the</strong> Extent<br />
of <strong>the</strong> Concrete<br />
Monolith<br />
Sec. 5.4.3.1 Removal of Shaft<br />
Infrastructure<br />
Sec. 5.4.7 Waste Rock<br />
Management Area<br />
Table 8.1 Hazardous<br />
Materials Arising<br />
from <strong>the</strong><br />
Decommissioning<br />
Table 8.2 Waste Materials<br />
Arising from<br />
Decommissioning<br />
Preliminary Decommissioning Plan (NWMO DGR-TR-2011-39 R000)<br />
Information Type Scope of New Information Information Source CEAA<br />
Registry<br />
Item<br />
Design update Updates configuration of<br />
underground services area<br />
Design update Updates configuration of<br />
underground services area<br />
Design update Updates configuration of<br />
underground services area<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
<strong>Response</strong> <strong>to</strong><br />
Undertakings<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Provides clarification on removal of<br />
shaft infrastructure<br />
Provides clarification on <strong>the</strong> rationale<br />
for <strong>the</strong> planned <strong>to</strong>p soil cover of 150<br />
mm on <strong>the</strong> waste rock pile at closure<br />
Provides clarification on waste<br />
materials estimated <strong>to</strong> be generated<br />
on yearly basis<br />
Provides clarification on waste<br />
materials <strong>to</strong> be removed as part of<br />
decommissioning and fur<strong>the</strong>r details<br />
on waste materials arising from<br />
decommissioning following<br />
construction<br />
Item #1 (i.e., Fig. 6-7 in PSR) in<br />
OPG Design Updates Letter<br />
dated Feb.10, 2012 [1]<br />
Item #1 in OPG Design Updates<br />
Letter dated Feb.10, 2012 [1]<br />
Item #1 (i.e., Fig. 13-1 in PSR) in<br />
OPG Design Updates Letter<br />
dated Feb.10, 2012 [1]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-03-58 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />
Letter dated Jul.9, 2012 [5]<br />
<strong>Response</strong> <strong>to</strong> Undertaking TIS 9<br />
from Jul.18 Technical Information<br />
Session #1 in OPG Letter dated<br />
Aug.15, 2012 [9]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-46 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-46 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
336<br />
336<br />
336<br />
608<br />
Page 134 of 138<br />
New<br />
692 �<br />
363<br />
363