05.01.2013 Views

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Fig. 3.5 DGR Base Case<br />

Layout<br />

Fig. 3.6 Underground<br />

Services Area<br />

Fig. 5.2 Shaft Services Area<br />

Showing <strong>the</strong> Extent<br />

of <strong>the</strong> Concrete<br />

Monolith<br />

Sec. 5.4.3.1 Removal of Shaft<br />

Infrastructure<br />

Sec. 5.4.7 Waste Rock<br />

Management Area<br />

Table 8.1 Hazardous<br />

Materials Arising<br />

from <strong>the</strong><br />

Decommissioning<br />

Table 8.2 Waste Materials<br />

Arising from<br />

Decommissioning<br />

Preliminary Decommissioning Plan (NWMO DGR-TR-2011-39 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

Design update Updates configuration of<br />

underground services area<br />

Design update Updates configuration of<br />

underground services area<br />

Design update Updates configuration of<br />

underground services area<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Undertakings<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on removal of<br />

shaft infrastructure<br />

Provides clarification on <strong>the</strong> rationale<br />

for <strong>the</strong> planned <strong>to</strong>p soil cover of 150<br />

mm on <strong>the</strong> waste rock pile at closure<br />

Provides clarification on waste<br />

materials estimated <strong>to</strong> be generated<br />

on yearly basis<br />

Provides clarification on waste<br />

materials <strong>to</strong> be removed as part of<br />

decommissioning and fur<strong>the</strong>r details<br />

on waste materials arising from<br />

decommissioning following<br />

construction<br />

Item #1 (i.e., Fig. 6-7 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

Item #1 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

Item #1 (i.e., Fig. 13-1 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-58 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> Undertaking TIS 9<br />

from Jul.18 Technical Information<br />

Session #1 in OPG Letter dated<br />

Aug.15, 2012 [9]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-46 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-46 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

336<br />

336<br />

336<br />

608<br />

Page 134 of 138<br />

New<br />

692 �<br />

363<br />

363

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!