OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Fig. 2.1 Underground DGR<br />

Layout<br />

Sec. 4.1 Regula<strong>to</strong>ry<br />

Requirements<br />

Sec. 4.2.3 Occupational<br />

Collective Dose<br />

Benchmark<br />

Sec. 6 Occupational Dose<br />

Estimates<br />

Sec. 7 Elimination,<br />

Abatement and<br />

Control Measures<br />

Sec. 7.3 Initial<br />

Recommendations<br />

for Dose Reduction<br />

for <strong>the</strong> DGR<br />

Appendix C Staffing Models and<br />

Detailed Dose Rate<br />

Results<br />

Preliminary ALARA Assessment (NWMO DGR-TR-2011-36 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

Design update Updates configuration of underground<br />

services area<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on equivalent dose<br />

limits considered by <strong>the</strong> project<br />

Provides clarification on <strong>the</strong> purpose and<br />

use of collective dose benchmark<br />

Provides clarification on worker activities<br />

involved in waste package handling<br />

Provides dose estimates <strong>to</strong> persons who<br />

will transfer waste packages from WWMF<br />

<strong>to</strong> DGR<br />

Provides clarification on how individual<br />

worker doses are kept ALARA<br />

Provides clarification on current status of<br />

dispositions of initial recommendations<br />

Provides clarification on worker activities<br />

involved in waste package handling<br />

Item #1 (i.e., Fig. 6-7 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-07 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-39 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-01-26 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-01-28 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-44 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-39 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-01-26 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

336<br />

363<br />

363<br />

363<br />

363<br />

363<br />

363<br />

363<br />

Page 131 of 138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!