05.01.2013 Views

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Sec. 6.3 Underground<br />

Facilities<br />

Fig. 6-6 Isometric View of<br />

<strong>the</strong> Reposi<strong>to</strong>ry<br />

Level<br />

Fig. 6-7 DGR Base Case<br />

Layout<br />

Preliminary Safety Report (00216-SR-01320-00001 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 6.3.1.2 Shaft Liner <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 6.3.1.4 Main Koepe<br />

Friction Hoist<br />

Provides clarification of postclosure<br />

safety relevance of some design<br />

features<br />

Provides clarification on panel room<br />

development procedures<br />

Provides clarification on emergency<br />

egress via personnel access doors<br />

placed in each emplacement room<br />

end-wall<br />

Design update Updates configuration of<br />

underground services area<br />

Design update Updates configuration of<br />

underground services area<br />

Provides additional design<br />

information on shaft liners<br />

Provides clarification on design<br />

information of shaft liners<br />

Design update Updates design description of main<br />

shaft cage<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-02-55 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #2<br />

Letter dated Jun.1, 2012 [4]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-03-53 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-60 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

Item #1 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

Item #1 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-17 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

Submission of supplementary<br />

material <strong>to</strong> IR Package #1<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-05 and<br />

IR-LPSC-03-17<br />

Letter dated Jul.10, 2012 [6]<br />

Item #5 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

Sec. 6.3.2.1 Layout Design update Updates <strong>the</strong> ventilation shaft layout Item #4 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

523<br />

608<br />

608<br />

336<br />

336<br />

363<br />

606<br />

336<br />

336<br />

Page 82 of 138<br />

New

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!