05.01.2013 Views

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Attachment 1 <strong>to</strong> OPG letter, Albert Sweetnam <strong>to</strong> Dr. Stella Swanson, “Deep Geologic Reposi<strong>to</strong>ry Project for Low and Intermediate Level Waste – Submission of<br />

<strong>Response</strong>s <strong>to</strong> <strong>the</strong> Final Sub-set of Package #4 Information Requests”, CD#: 00216-CORR-00531-00143.<br />

IR# EIS Guidelines<br />

Section<br />

Transfer Flux (Bq/a)<br />

1.E+08<br />

1.E+07<br />

1.E+06<br />

1.E+05<br />

1.E+04<br />

1.E+03<br />

1.E+02<br />

1.E+01<br />

NE-RC: Total<br />

NE-RT1: Total<br />

NE-RT1: C-14<br />

NE-RT1: Zr-93<br />

NE-RT1: Nb-94<br />

NE-RT1: Nb-93m<br />

Information Request and <strong>Response</strong><br />

1.E+00<br />

10 100 1,000 10,000 100,000 1,000,000 10,000,000<br />

Time (a)<br />

Figure 1: Radionuclide Flux <strong>to</strong> <strong>the</strong> Base of <strong>the</strong> Shafts with Instant Resaturation and Release and<br />

No Sorption (NE-RT1) Compared <strong>to</strong> Reference Case (NE-RC) (Figure 8-47 of <strong>the</strong> PSR)<br />

Table 2: Maximum Doses <strong>to</strong> an Adult for Different Contaminant Release and Transport<br />

Assumptions (Table 8-21 of <strong>the</strong> PSR)<br />

Case Brief Description Max. Calculated<br />

Dose (mSv/year)<br />

Time of Max.<br />

Calculated<br />

Dose (Ma)<br />

NE-RC Reference case (with underpressures) 2 × 10 -15<br />

NE-RS Resaturation at closure (with underpressures) 4 × 10 -14<br />

10 a<br />

NE-RT1 Resaturation at closure, instant release <strong>to</strong> groundwater, no 4 × 10<br />

sorption (with underpressures)<br />

-9<br />

10 a<br />

NE-RT2 Resaturation at closure, instant release <strong>to</strong> groundwater, no<br />

sorption (without underpressures)<br />

5 × 10 -9 10 a<br />

Note:<br />

a.<br />

This represents <strong>the</strong> end of <strong>the</strong> calculation period.<br />

10 a<br />

Page 19 of 69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!