OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Sec. 9.4.1 Ground<br />

Improvement<br />

Sec. 9.4.2 Preparation of<br />

Shaft Collars<br />

Sec. 9.4.3 Erection of Main<br />

Shaft and<br />

Ventilation Shaft<br />

Headframes<br />

Fig. 9-4 Initiation of Shaft<br />

Sinking<br />

Fig. 9-5 Complete Shaft<br />

Sinking and<br />

Establish Shaft<br />

Stations<br />

Preliminary Safety Report (00216-SR-01320-00001 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on proposed<br />

sequencing for design development<br />

Provides clarification on ground<br />

improvement methods considered by<br />

<strong>the</strong> project<br />

Provides clarification on <strong>the</strong> drill and<br />

blast and ground support techniques<br />

during shaft excavation considered<br />

by <strong>the</strong> project<br />

Provides additional information on<br />

waste rock dumping facility and muck<br />

bay<br />

Provides clarification on construction<br />

of underground facility<br />

Design update Updates configuration of<br />

underground services area<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on construction<br />

of underground facility<br />

Submission of supplementary<br />

material <strong>to</strong> IR Package #1<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-25<br />

Letter dated Jul.10, 2012 [6]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-31 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-32 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-33 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-35 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

Item #1 (i.e., Fig. 6-7 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-35 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

606<br />

363<br />

363<br />

363<br />

363<br />

336<br />

363<br />

Page 97 of 138<br />

New

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!