OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Sec. 6.3.2.2 Shaft Liner <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 6.3.2.3 Ventilation Shaft<br />

Hoisting System<br />

Fig. 6-10 Cross-Sectional<br />

View of Ventilation<br />

Shaft<br />

Sec. 6.3.2.4 Ventilation Shaft<br />

Conveyances<br />

Fig. 6-11 Permanent Skip<br />

and Bale with Cage<br />

Sec. 6.3.3 Shaft Safety<br />

Systems<br />

Sec. 6.3.4 Underground Shaft<br />

and Services Area<br />

Preliminary Safety Report (00216-SR-01320-00001 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

Provides clarification on design<br />

information of shaft liners<br />

Design update Updates design description of<br />

ventilation shaft hoist arrangements<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on emergency<br />

egress duties required of <strong>the</strong><br />

ventilation shaft<br />

Submission of supplementary<br />

material <strong>to</strong> IR Package #1<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-05 and<br />

IR-LPSC-03-17<br />

Letter dated Jul.10, 2012 [6]<br />

Item #4 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-60 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

Design update Updates <strong>the</strong> ventilation shaft layout Item #4 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

Design update Updates design description of shaft<br />

conveyances<br />

Item #4 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

Correction Change in para 1 on p.317 Item #1 in OPG Corrections Letter<br />

dated Feb.10, 2012 [2]<br />

Design update Updates design description of<br />

ventilation shaft hoist arrangements<br />

Design update Updates design description of shaft<br />

safety systems<br />

Updates design description of main<br />

shaft cage<br />

Design update Updates various areas of design<br />

description<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides additional information on<br />

<strong>the</strong> permanent refuge station<br />

Item #4 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

Item #4 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

Item #5 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

Item #1 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-60 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

606<br />

336<br />

608<br />

336<br />

336<br />

335<br />

336<br />

336<br />

336<br />

336<br />

608<br />

Page 83 of 138<br />