05.01.2013 Views

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Attachment 1 <strong>to</strong> OPG letter, Albert Sweetnam <strong>to</strong> Dr. Stella Swanson, “Deep Geologic Reposi<strong>to</strong>ry Project for Low and Intermediate Level Waste – Submission of<br />

<strong>Response</strong>s <strong>to</strong> <strong>the</strong> Final Sub-set of Package #4 Information Requests”, CD#: 00216-CORR-00531-00143.<br />

IR# EIS Guidelines<br />

Section<br />

Information Request and <strong>Response</strong><br />

While small-scale field cells can also be designed <strong>to</strong> measure <strong>the</strong> drainage conditions under ambient conditions, field<br />

cells are not appropriate in this circumstance because of <strong>the</strong> short length of construction. By <strong>the</strong> time <strong>the</strong> target rock<br />

had been excavated, and meaningful data obtained from <strong>the</strong> field test charges, <strong>the</strong> full target waste rock piles will<br />

already be in place, and moni<strong>to</strong>ring data from <strong>the</strong>se waste rock piles would provide <strong>the</strong> data that <strong>the</strong> small-scale field<br />

cell results were intended <strong>to</strong> provide.<br />

In addition, <strong>the</strong> DGR Project has already been designed <strong>to</strong> mitigate potential environmental effects of <strong>the</strong> waste rock<br />

piles, specifically <strong>the</strong> Ordovician shales. This includes using <strong>the</strong> shale in berms and capping <strong>the</strong> pile if it is not used<br />

after one year. Given <strong>the</strong> low permeability of <strong>the</strong> dense glacial till underlying <strong>the</strong> WRMA, no appreciable migration of<br />

<strong>the</strong> waste rock leachate in<strong>to</strong> <strong>the</strong> groundwater is expected, as described in OPG’s response <strong>to</strong> IR-EIS-03-57 (OPG<br />

2012c). A shallow groundwater moni<strong>to</strong>ring program is being commissioned in 2012 <strong>to</strong> establish baseline groundwater<br />

conditions and allow for <strong>the</strong> detection of future WRMA effects, if any, on <strong>the</strong> groundwater system during DGR<br />

construction and operations.<br />

As <strong>the</strong> waste rock pile will develop slowly during <strong>the</strong> first year while <strong>the</strong> shafts are being excavated, a reasonable<br />

approach <strong>to</strong> confirm <strong>the</strong> geochemical properties and modelling predictions would be <strong>to</strong> moni<strong>to</strong>r <strong>the</strong> waste shale rock as<br />

it is excavated, as well as <strong>the</strong> drainage chemistry from <strong>the</strong> WRMA. Should moni<strong>to</strong>ring results indicate that <strong>the</strong> waste<br />

shale rock pile is behaving differently than suggested by <strong>the</strong> labora<strong>to</strong>ry data, adjustments can be made such as<br />

removing <strong>the</strong> shale from <strong>the</strong> site, covering <strong>the</strong> shale pile earlier or changing runoff collection routing, <strong>to</strong> ensure proper<br />

mitigation and treatment, as described fur<strong>the</strong>r in <strong>the</strong> response <strong>to</strong> IR-EIS-04-130.<br />

References:<br />

INAP. 2012. International Network for Acid Prevention. The GARD Guide. Accessed on August 7, 2012 from<br />

www.gardguide.com.<br />

GOLDER. 2011. Results of Geochemical Testing of Rock Samples from <strong>the</strong> Deep Geologic Reposi<strong>to</strong>ry (DGR).<br />

Golder Associates Ltd. Technical Memorandum from C.McRae <strong>to</strong> D.Barker (NWMO). (included in CEAA Registry<br />

Doc# 523)<br />

MEND. 2009. Prediction Manual for Drainage Chemistry from Sulphidic Geologic Materials. MEND Report 1.20.1.<br />

Mining Environment Neutral Drainage Program, Natural Resources Canada.<br />

MOEE. 1994. Water Management Policies Guidelines, Provincial Water Quality Objectives of <strong>the</strong> Ministry of<br />

Environment and Energy. PIBS #3303e.<br />

OPG. 2012a. OPG Letter, A. Sweetnam <strong>to</strong> S. Swanson, “Deep Geologic Reposi<strong>to</strong>ry Project for Low and Intermediate<br />

Level Waste - Submission of <strong>Response</strong>s <strong>to</strong> Information Request Package #2”, CD# 00216-CORR-00531-00115,<br />

June 1, 2012. (CEAA Registry #523)<br />

OPG. 2012b. OPG Letter, A. Sweetnam <strong>to</strong> S. Swanson, “Deep Geologic Reposi<strong>to</strong>ry Project for Low and Intermediate<br />

Page 66 of 69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!