Ontario Power Generation's Response to the Joint Review
Ontario Power Generation's Response to the Joint Review
Ontario Power Generation's Response to the Joint Review
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />
Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />
Section/Figure/Table in<br />
Document<br />
Sec. 4.7.1.1 Land Clearing,<br />
Grubbing and Site<br />
Grading<br />
Sec. 4.7.1.3 Site Drainage and<br />
S<strong>to</strong>rmwater<br />
Management<br />
Environmental Impact Statement (00216-REP-07701-00001 R000)<br />
Information Type Scope of New Information Information Source CEAA<br />
Registry<br />
Item<br />
<strong>Response</strong> <strong>to</strong><br />
Undertakings<br />
<strong>Response</strong> <strong>to</strong><br />
Undertakings<br />
Sec. 4.7.4.1 Shaft Excavation <strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Updates information on<br />
characterization of uncertainty with<br />
radioactive measurements<br />
Provides clarification on calculating<br />
quantities of radionuclides<br />
Provides clarification on uncertainty<br />
associated with radionuclide<br />
inven<strong>to</strong>ry<br />
Provides clarification for <strong>the</strong> basis of<br />
inven<strong>to</strong>ries for key radionuclides<br />
Provides more detailed information of<br />
<strong>the</strong> existing site conditions of <strong>the</strong><br />
Bruce nuclear site and proposed<br />
DGR grading <strong>to</strong>pography<br />
Provides additional information on<br />
site drainage and s<strong>to</strong>rmwater<br />
management<br />
Provides more detailed information of<br />
<strong>the</strong> existing site conditions of <strong>the</strong><br />
Bruce nuclear site and proposed<br />
DGR grading <strong>to</strong>pography<br />
Provides additional information on<br />
development of <strong>the</strong> shaft collar<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-01-06 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-01-07 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-01-20 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
Submission of supplementary<br />
material <strong>to</strong> IR Package #1<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-01-06 and<br />
IR-EIS-01-20<br />
Letter dated Jul.10, 2012 [6]<br />
<strong>Response</strong> <strong>to</strong> Undertaking TIS 12<br />
from Jul.18 Technical Information<br />
Session #1 in OPG Letter dated<br />
Aug.31, 2012 [11]<br />
<strong>Response</strong> <strong>to</strong> Undertaking TIS 10<br />
from Jul.18 Technical Information<br />
Session #1 in OPG Letter dated<br />
Aug.15, 2012 [9]<br />
<strong>Response</strong> <strong>to</strong> Undertaking TIS 12<br />
from Jul.18 Technical Information<br />
Session #1 in OPG Letter dated<br />
Aug.31, 2012 [11]<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-01-01 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
363<br />
363<br />
363<br />
606<br />
Page 11 of 138<br />
New<br />
715 �<br />
692 �<br />
715 �<br />
363