Serge Clement 1011170042-TM-G2100-0001-01<br />

Tetra Tech<br />

December 23, 2011<br />

Table 3: Inflows through <strong>the</strong> Cracked Concrete Liner over <strong>the</strong> Top 190 m of <strong>the</strong> Shaft – 3 m Grouted Zone<br />

Formation Thickness Concrete Liner Kh (m/s) Inflows (usgal/min)<br />

(m) uncracked 2,500 yr<br />

100,000<br />

yr<br />

What if<br />

Scenario<br />

1<br />

8/10<br />

What if<br />

Scenario<br />

2<br />

uncracked 2,500 yr<br />

100,000<br />

yr<br />

What if<br />

Scenario<br />

1<br />

Lucas 35.2 10 -11 10 -10 10 -8 10 -7 10 -6 0.0 0.1 9.6 42.9 80.8<br />

Amherstburg 38.4 10 -11 10 -10 10 -8 10 -7 10 -6 0.0 0.3 11.2 25.4 31.7<br />

Bois Blanc 50.1 10 -11 10 -10 10 -8 10 -7 10 -6 0.1 0.6 19.2 35.7 40.2<br />

Bass Islands 43.8 10 -11 10 -10 10 -8 10 -7 10 -6 0.1 0.7 13.6 18.5 19.2<br />

Salina G 7.6 10 -11 10 -10 10 -8 10 -7 10 -6 0.0 0.1 0.3 0.3 0.3<br />

What if<br />

Scenario<br />

2<br />

Total thickness 175.1 Total Inflow = 0.2 1.8 53.9 122.8 172.2<br />

For hydraulic conductivities of <strong>the</strong> rock formations, before and after grouting, refer <strong>to</strong> Table 1 and Figure 1.<br />

Table 4: Inflows through <strong>the</strong> Cracked Concrete Liner over <strong>the</strong> Top 190 m of <strong>the</strong> Shaft – 4 m Grouted Zone<br />

Formation Thickness Concrete Liner Kh (m/s) Inflows (usgal/min)<br />

(m) uncracked 2,500 yr<br />

100,000<br />

yr<br />

What if<br />

Scenario<br />

1<br />

What if<br />

Scenario<br />

2<br />

uncracked 2,500 yr<br />

100,000<br />

yr<br />

What if<br />

Scenario<br />

1<br />

What if<br />

Scenario<br />

2<br />

Lucas 35.2 10 -11 10 -10 10 -8 10 -7 10 -6 0.0 0.1 9.4 41.0 74.9<br />

Amherstburg 38.4 10 -11 10 -10 10 -8 10 -7 10 -6 0.0 0.3 10.4 22.4 27.3<br />

Bois Blanc 50.1 10 -11 10 -10 10 -8 10 -7 10 -6 0.1 0.6 18.0 32.3 35.9<br />

Bass Islands 43.8 10 -11 10 -10 10 -8 10 -7 10 -6 0.1 0.7 12.7 17.0 17.6<br />

Salina G 7.6 10 -11 10 -10 10 -8 10 -7 10 -6 0.0 0.1 0.3 0.3 0.3<br />

Total thickness 175.1 Total Inflow = 0.2 1.8 50.9 113.0 156.0<br />