OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Sec. 6.8.4 Emergency<br />

Ventilation Controls<br />

Preliminary Safety Report (00216-SR-01320-00001 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on <strong>the</strong><br />

approach <strong>to</strong> fire protection<br />

Sec. 6.8.5 Refuge Stations Design update Updates information on refuge<br />

stations<br />

Fig. 6-28 Location of Refuge<br />

Stations<br />

Sec. 6.9 Emergency<br />

<strong>Response</strong><br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Updates information on refuge<br />

stations<br />

Provides clarification on location of<br />

portable refuge stations<br />

Provides clarification on use of<br />

refuge stations<br />

Design update Updates configuration of<br />

underground services area<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on location of<br />

portable refuge stations<br />

Provides clarification on ventilation in<br />

<strong>the</strong> event of release of significant<br />

volatile radionuclides/hazardous<br />

substances<br />

Provides clarification on mine rescue<br />

support during operation<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-15 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

Item #1 in OPG Design Updates<br />

Letter dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-09 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-03-60 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-60 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

Item #1 (i.e., Fig. 6-7 in PSR) in<br />

OPG Design Updates Letter<br />

dated Feb.10, 2012 [1]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-03-60 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-15 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-61 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

363<br />

336<br />

363<br />

608<br />

608<br />

336<br />

608<br />

363<br />

608<br />

Page 87 of 138<br />