Attachment 1 <strong>to</strong> OPG letter, Albert Sweetnam <strong>to</strong> Dr. Stella Swanson, “Deep Geologic Reposi<strong>to</strong>ry Project for Low and Intermediate Level Waste – Submission of<br />

<strong>Response</strong>s <strong>to</strong> <strong>the</strong> Final Sub-set of Package #4 Information Requests”, CD#: 00216-CORR-00531-00143.<br />

IR# EIS Guidelines<br />

Section<br />

Information Request and <strong>Response</strong><br />

<strong>the</strong>se tunnels were dry with no pooled water even though <strong>the</strong>y were only 30-m below <strong>the</strong> bot<strong>to</strong>m of Lake <strong>Ontario</strong><br />

(NWMO 2011, p.121).<br />

The postclosure safety assessment evaluated <strong>the</strong> impacts for each of <strong>the</strong> cases shown in Figure 8.3 and 8.4 above. In<br />

all cases except for <strong>the</strong> shaft seal failure cases, <strong>the</strong> dose consequences were very low. In <strong>the</strong> case of <strong>the</strong> most severe<br />

shaft seal failure scenario (SF-ED), <strong>the</strong> reposi<strong>to</strong>ry saturation peaked at about 75%. This was <strong>the</strong> highest overall dose<br />

scenario, but <strong>the</strong> dose was due <strong>to</strong> <strong>the</strong> loss of gas from <strong>the</strong> reposi<strong>to</strong>ry up <strong>the</strong> shaft due <strong>to</strong> <strong>the</strong> poor seals, ra<strong>the</strong>r than due<br />

<strong>to</strong> resaturation of <strong>the</strong> reposi<strong>to</strong>ry.<br />

To bound uncertainty surrounding <strong>the</strong> impacts from reposi<strong>to</strong>ry resaturation, <strong>the</strong> NE-RS calculation case assumes a<br />

100% saturated reposi<strong>to</strong>ry from closure (see Section 7.3.2.1 of QUINTESSA et al 2011). This case is not physical<br />

since it does not include any path for this water <strong>to</strong> have entered <strong>the</strong> reposi<strong>to</strong>ry; nor does it include gas generation.<br />

Ra<strong>the</strong>r, this case focuses on, and maximizes, <strong>the</strong> release of radionuclides from <strong>the</strong> wastes in<strong>to</strong> groundwater. Although<br />

<strong>the</strong> early resaturation of <strong>the</strong> reposi<strong>to</strong>ry increases <strong>the</strong> corrosion of <strong>the</strong> wastes, <strong>the</strong> release of radionuclides from <strong>the</strong><br />

wastes and reposi<strong>to</strong>ry via groundwater, and <strong>the</strong> calculated maximum dose, <strong>the</strong> dose remains orders of magnitude<br />

below <strong>the</strong> dose criterion and so <strong>the</strong> safety of <strong>the</strong> reposi<strong>to</strong>ry system is not compromised.<br />

References:<br />

GEOFIRMA. 2011. Postclosure Safety Assessment: Groundwater Modelling. Geofirma Engineering Ltd. report for<br />

<strong>the</strong> Nuclear Waste Management Organization NWMO DGR-TR-2011-30 R000. Toron<strong>to</strong>, Canada. (available at<br />

www.nwmo.ca/dgrpostclosuresafetyassessmentreports)<br />

GEOFIRMA and QUINTESSA. 2011. Postclosure Safety Assessment: Gas Modelling. Geofirma Engineering Ltd. and<br />

Quintessa Ltd. report for <strong>the</strong> Nuclear Waste Management Organization NWMO DGR-TR-2011-31 R000. Toron<strong>to</strong>,<br />

Canada. (available at www.nwmo.ca/dgrpostclosuresafetyassessmentreports)<br />

NWMO. 2011. Geosyn<strong>the</strong>sis. Nuclear Waste Management Organization report NWMO DGR-TR-2011-11 R000.<br />

Toron<strong>to</strong>, Canada. (CEAA Registry Doc# 300)<br />

QUINTESSA and GEOFIRMA. 2011. Postclosure Safety Assessment: T2GGM Version 2: Gas Generation and<br />

Transport Code. Quintessa Ltd. and Geofirma Engineering Ltd. report for <strong>the</strong> Nuclear Waste Management<br />

Organization NWMO DGR-TR-2011-33 R000. Toron<strong>to</strong>, Canada. (available at<br />

www.nwmo.ca/dgrpostclosuresafetyassessmentreports)<br />

QUINTESSA, GEOFIRMA and SENES. 2011. Postclosure Safety Assessment. Quintessa Ltd., Geofirma Engineering<br />

Ltd. and SENES Consultants Ltd. report for <strong>the</strong> Nuclear Waste Management Organization NWMO DGR-TR-2011-25<br />

R000. Toron<strong>to</strong>, Canada. (CEAA Registry Doc# 300)<br />

Page 29 of 69