Ontario Power Generation's Response to the Joint Review
Ontario Power Generation's Response to the Joint Review
Ontario Power Generation's Response to the Joint Review
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />
Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />
Section/Figure/Table in<br />
Document<br />
Sec. 9.1 Introduction <strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Fig. 9-1 DGR Project Site<br />
Preparation and<br />
Construction<br />
Schedule<br />
Preliminary Safety Report (00216-SR-01320-00001 R000)<br />
Information Type Scope of New Information Information Source CEAA<br />
Registry<br />
Item<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Sec. 9.2.3 Site Grading <strong>Response</strong> <strong>to</strong><br />
Undertakings<br />
Sec. 9.3.1 Installation of<br />
Construction<br />
Services<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Sec. 9.2 Site Preparation <strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Provides clarification of <strong>the</strong> shaft seal<br />
resaturation behaviour<br />
Provides clarification of how<br />
information is identified and<br />
communicated during design and<br />
construction<br />
Provides clarification on site<br />
preparation and construction<br />
schedule in Fig. 9-1, including<br />
completion of engineering details and<br />
construction activities<br />
Provides clarification on proposed<br />
sequencing for design development<br />
Provides more detailed information of<br />
<strong>the</strong> existing site conditions of <strong>the</strong><br />
Bruce nuclear site and proposed<br />
DGR grading <strong>to</strong>pography<br />
Provides clarification on emergency<br />
response and preparedness<br />
arrangements for construction phase<br />
Provides clarification on mine rescue<br />
support during construction<br />
Provides clarification on proposed<br />
sequencing for design development<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-04-153 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />
Letter dated Sep.28, 2012 [13]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-02-55 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #2<br />
Letter dated Jun.1, 2012 [4]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-25 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
Submission of supplementary<br />
material <strong>to</strong> IR Package #1<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-25<br />
Letter dated Jul.10, 2012 [6]<br />
<strong>Response</strong> <strong>to</strong> Undertaking TIS 12<br />
from Jul.18 Technical Information<br />
Session #1 in OPG Letter dated<br />
Aug.31, 2012 [11]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-45 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-03-61 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />
Letter dated Jul.9, 2012 [5]<br />
Submission of supplementary<br />
material <strong>to</strong> IR Package #1<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-25<br />
Letter dated Jul.10, 2012 [6]<br />
523<br />
363<br />
606<br />
Page 95 of 138<br />
New<br />
�<br />
715 �<br />
363<br />
608<br />
606