OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Sec. 9.1 Introduction <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Fig. 9-1 DGR Project Site<br />

Preparation and<br />

Construction<br />

Schedule<br />

Preliminary Safety Report (00216-SR-01320-00001 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 9.2.3 Site Grading <strong>Response</strong> <strong>to</strong><br />

Undertakings<br />

Sec. 9.3.1 Installation of<br />

Construction<br />

Services<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 9.2 Site Preparation <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification of <strong>the</strong> shaft seal<br />

resaturation behaviour<br />

Provides clarification of how<br />

information is identified and<br />

communicated during design and<br />

construction<br />

Provides clarification on site<br />

preparation and construction<br />

schedule in Fig. 9-1, including<br />

completion of engineering details and<br />

construction activities<br />

Provides clarification on proposed<br />

sequencing for design development<br />

Provides more detailed information of<br />

<strong>the</strong> existing site conditions of <strong>the</strong><br />

Bruce nuclear site and proposed<br />

DGR grading <strong>to</strong>pography<br />

Provides clarification on emergency<br />

response and preparedness<br />

arrangements for construction phase<br />

Provides clarification on mine rescue<br />

support during construction<br />

Provides clarification on proposed<br />

sequencing for design development<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-04-153 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />

Letter dated Sep.28, 2012 [13]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-02-55 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #2<br />

Letter dated Jun.1, 2012 [4]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-25 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

Submission of supplementary<br />

material <strong>to</strong> IR Package #1<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-25<br />

Letter dated Jul.10, 2012 [6]<br />

<strong>Response</strong> <strong>to</strong> Undertaking TIS 12<br />

from Jul.18 Technical Information<br />

Session #1 in OPG Letter dated<br />

Aug.31, 2012 [11]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-45 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-61 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

Submission of supplementary<br />

material <strong>to</strong> IR Package #1<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-01-25<br />

Letter dated Jul.10, 2012 [6]<br />

523<br />

363<br />

606<br />

Page 95 of 138<br />

New<br />

�<br />

715 �<br />

363<br />

608<br />

606

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!