OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />
Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />
Section/Figure/Table in<br />
Document<br />
Ch. 1 Introduction <strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Sec. 1.3.2 Postclosure Period <strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Fig. 1-3 Schematic of <strong>the</strong><br />
DGR<br />
Sec. 1.9 Strategies Used for<br />
<strong>the</strong> DGR Project<br />
Sec. 2.1.5 Bruce Nuclear Site<br />
Development<br />
Fig. 3-1 Borehole and<br />
Geophysical<br />
Investigations at<br />
<strong>the</strong> Bruce Nuclear<br />
Site<br />
Sec. 3.4 Additional<br />
Geoscientific<br />
Investigations<br />
Preliminary Safety Report (00216-SR-01320-00001 R000)<br />
Information Type Scope of New Information Information Source CEAA<br />
Registry<br />
Item<br />
Provides clarification on categories of<br />
L&ILW <strong>to</strong> be placed in <strong>the</strong> DGR<br />
Provides clarification on <strong>the</strong><br />
alternative means “no institutional<br />
control necessary”<br />
Design update Updates configuration of<br />
underground services area<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-04-102 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />
Letter dated Aug.27, 2012 [10]<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-03-50 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />
Letter dated Jul.9, 2012 [5]<br />
Item #1 (i.e., Fig. 6-7 in PSR) in<br />
OPG Design Updates Letter<br />
dated Feb.10, 2012 [1]<br />
Provides clarification on peer review <strong>Response</strong> <strong>to</strong> IR-EIS-01-18 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
Provides clarification on waste<br />
incineration at WWMF<br />
Design update Updates configuration of<br />
underground services area<br />
<strong>Response</strong> <strong>to</strong><br />
Undertakings<br />
Ch. 4 Geoscience <strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Provides results of <strong>the</strong> 2011 shaft<br />
pilot hole program<br />
Provides additional information on<br />
geoscience model uncertainties and<br />
treatment<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-04-104 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />
Letter dated Aug.27, 2012 [10]<br />
Item #1 (i.e., Fig. 6-7 in PSR) in<br />
OPG Design Updates Letter<br />
dated Feb.10, 2012 [1]<br />
<strong>Response</strong> <strong>to</strong> Undertaking TIS 15<br />
from Jul.18 Technical Information<br />
Session #1 in OPG Letter dated<br />
Aug.15, 2012 [9]<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-04-112 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />
Letter dated Sep.28, 2012 [13]<br />
Page 72 of 138<br />
New<br />
704 �<br />
608<br />
336<br />
363<br />
704 �<br />
336<br />
692 �<br />
�