OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />
Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />
Section/Figure/Table in<br />
Document<br />
Fig. 9-2 DGR Construction<br />
Layout<br />
Sec. 9.3.2 S<strong>to</strong>rmwater<br />
Management<br />
Sec. 9.3.3 Waste Rock<br />
Handling<br />
Sec. 9.3.4 Conventional<br />
Hazards Materials<br />
Management<br />
Table 9-1 Projected Range of<br />
Annual Output of<br />
Waste<br />
Preliminary Safety Report (00216-SR-01320-00001 R000)<br />
Information Type Scope of New Information Information Source CEAA<br />
Registry<br />
Item<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
<strong>Response</strong> <strong>to</strong><br />
Undertakings<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
<strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Sec. 9.4 Construction <strong>Response</strong> <strong>to</strong><br />
Information Requests<br />
Provides additional design<br />
information on temporary concrete<br />
batch plant and site services shown<br />
in Fig. 9-2<br />
Provides clarification on <strong>the</strong> water<br />
treatment system and plant<br />
Provides additional information on<br />
site drainage and s<strong>to</strong>rmwater<br />
management<br />
Provides more detailed information of<br />
<strong>the</strong> existing site conditions of <strong>the</strong><br />
Bruce nuclear site and proposed<br />
DGR grading <strong>to</strong>pography<br />
Provides additional information on<br />
construction of waste rock<br />
management area<br />
Provides clarification on s<strong>to</strong>rage of<br />
explosives<br />
Provides clarification on <strong>the</strong><br />
estimated range of annual output of<br />
grey water and <strong>the</strong> estimated waste<br />
rock volume<br />
Provides clarification on construction<br />
of plenums as part of <strong>the</strong> shaft presinking<br />
activities<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-26 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-27 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
<strong>Response</strong> <strong>to</strong> Undertaking TIS 10<br />
from Jul.18 Technical Information<br />
Session #1 in OPG Letter dated<br />
Aug.15, 2012 [9]<br />
<strong>Response</strong> <strong>to</strong> Undertaking TIS 12<br />
from Jul.18 Technical Information<br />
Session #1 in OPG Letter dated<br />
Aug.31, 2012 [11]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-28 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
<strong>Response</strong> <strong>to</strong> IR-EIS-01-02 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-29 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
<strong>Response</strong> <strong>to</strong> IR-LPSC-01-30 in<br />
OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />
Letter dated Mar.9, 2012 [3]<br />
363<br />
363<br />
Page 96 of 138<br />
New<br />
692 �<br />
715 �<br />
363<br />
363<br />
363<br />
363