Attachment 1 <strong>to</strong> OPG letter, Albert Sweetnam <strong>to</strong> Dr. Stella Swanson, “Deep Geologic Reposi<strong>to</strong>ry Project for Low and Intermediate Level Waste – Submission of<br />

<strong>Response</strong>s <strong>to</strong> <strong>the</strong> Final Sub-set of Package #4 Information Requests”, CD#: 00216-CORR-00531-00143.<br />

IR# EIS Guidelines<br />

Section<br />

Information Request and <strong>Response</strong><br />

� seepage water from <strong>the</strong> reposi<strong>to</strong>ry<br />

� construction process water<br />

� runoff and seepage from waste rock<br />

Additional information is required <strong>to</strong> understand what potential effects this system will have on downstream water<br />

quality and aquatic biota.<br />

OPG <strong>Response</strong>:<br />

The response below is structured such that <strong>the</strong> twelve sections correspond <strong>to</strong> <strong>the</strong> twelve major bullets in <strong>the</strong><br />

Information Request. The design information presented in this response has been prepared in support of <strong>the</strong><br />

environmental assessment. The s<strong>to</strong>rmwater management system design will require <strong>Ontario</strong> Ministry of <strong>the</strong><br />

Environmental (MOE) approval through <strong>the</strong> Environmental Compliance Approval (ECA) process and thus may be<br />

modified should <strong>the</strong>re be additional requirements imposed by <strong>the</strong> MOE.<br />

1. Minimum, Maximum and Average Flows<br />

Estimates of average annual flows through <strong>the</strong> s<strong>to</strong>rmwater management system from all sources during DGR site<br />

preparation/construction and operation were presented in slides 51 <strong>to</strong> 53 of <strong>the</strong> presentation <strong>to</strong> <strong>the</strong> JRP Technical<br />

Information Session on July 18, 2012 (OPG 2012a). These are summarized in Table 1 below.<br />

Table 1: Average Annual Water Inflows <strong>to</strong> <strong>the</strong> S<strong>to</strong>rmwater Management Pond in L/s<br />

Infiltration from groundwater<br />

(reposi<strong>to</strong>ry dewatering/seepage)<br />

DGR Site Preparation/<br />

Construction<br />

Process water 21 *<br />

DGR Operation<br />

0.45 0.45<br />

Runoff from waste rock piles (s<strong>to</strong>rmwater) 1.4 0.77<br />

Runoff from o<strong>the</strong>r areas (s<strong>to</strong>rmwater) 2.8 3.4<br />

Total average annual inflow 26 6.1<br />

Note: *It is expected that process water will be pumped from underground at a peak flow rate of<br />

21 L/s. However for purposes of designing <strong>the</strong> SWMP it has been conservatively assumed<br />

that process water flow is constant at 21 L/s.<br />