OPG’s L&ILW Deep Geologic Reposi<strong>to</strong>ry Project<br />

Tracking Tables for IR <strong>Response</strong>s, Design Updates and Corrections, Rev.3<br />

Section/Figure/Table in<br />

Document<br />

Sec. 8.8.2.1 Reposi<strong>to</strong>ry<br />

Resaturation<br />

Fig. 8-46 Depth of Water in<br />

Reposi<strong>to</strong>ry (Non-<br />

Water-Limited<br />

Cases)<br />

Preliminary Safety Report (00216-SR-01320-00001 R000)<br />

Information Type Scope of New Information Information Source CEAA<br />

Registry<br />

Item<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 8.8.2.2 Waste Inven<strong>to</strong>ry <strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Sec. 8.8.2.4 Gas Generation <strong>Response</strong> <strong>to</strong><br />

Undertakings<br />

Sec. 8.8.2.6 Geosphere<br />

Transport<br />

Properties<br />

Sec. 8.8.2.7 Shaft Seal<br />

Performance<br />

Provides clarification of <strong>the</strong> range of<br />

resaturation levels and<br />

consequences<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-04-119 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #4<br />

Letter dated Sep.28, 2012 [13]<br />

Correction Change on Fig.8-46, p.563 Item #8 in OPG Corrections Letter<br />

dated Feb.10, 2012 [2]<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

<strong>Response</strong> <strong>to</strong><br />

Information Requests<br />

Provides clarification on <strong>the</strong><br />

uncertainties of contaminant<br />

inven<strong>to</strong>ries and impact on peak dose<br />

Provides clarification on <strong>the</strong><br />

uncertainty range in inven<strong>to</strong>ries for<br />

key radionuclides<br />

Provides additional information on<br />

<strong>the</strong> elevated pressure impact on gas<br />

generation reactions<br />

Provides information on diffusion<br />

coefficient uncertainty<br />

Provides additional information on<br />

shaft seal performance<br />

Provides clarification on <strong>the</strong><br />

treatment of <strong>the</strong> shaft EDZ in solute<br />

transport models<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-01-20 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #1<br />

Letter dated Mar.9, 2012 [3]<br />

Submission of supplementary<br />

material <strong>to</strong> IR Package #1<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-01-06 and<br />

IR-EIS-01-20<br />

Letter dated Jul.10, 2012 [6]<br />

<strong>Response</strong> <strong>to</strong> Undertaking TIS 16<br />

from Jul.18 Technical Information<br />

Session #1 in OPG Letter dated<br />

Aug.31, 2012 [11]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-02-35 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #2<br />

Letter dated Jun.1, 2012 [4]<br />

<strong>Response</strong> <strong>to</strong> IR-EIS-03-64 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

<strong>Response</strong> <strong>to</strong> IR-LPSC-03-62 in<br />

OPG <strong>Response</strong> <strong>to</strong> IR Package #3<br />

Letter dated Jul.9, 2012 [5]<br />

335<br />

363<br />

606<br />

Page 93 of 138<br />

New<br />

�<br />

715 �<br />

523<br />

608<br />

608