Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

Ontario Power Generation's Response to the Joint Review

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Attachment 1 <strong>to</strong> OPG letter, Albert Sweetnam <strong>to</strong> Dr. Stella Swanson, “Deep Geologic Reposi<strong>to</strong>ry Project for Low and Intermediate Level Waste – Submission of<br />

<strong>Response</strong>s <strong>to</strong> <strong>the</strong> Final Sub-set of Package #4 Information Requests”, CD#: 00216-CORR-00531-00143.<br />

IR# EIS Guidelines<br />

Section<br />

Information Request and <strong>Response</strong><br />

water suppression during operating hours and an allowance for continuous civil construction activities (e.g., floor<br />

concrete). As well, <strong>the</strong>se estimates do not take in<strong>to</strong> consideration options for recirculation of process water.<br />

A small allowance has been made in <strong>the</strong> discharge water estimate <strong>to</strong> reflect potential condensation in <strong>the</strong> ventilation<br />

shaft during summer conditions.<br />

The underground dewatering system is being designed <strong>to</strong> handle a peak discharge rate <strong>to</strong> ground surface, which is<br />

conservatively assumed <strong>to</strong> be 21 L/s. The following chart shows <strong>the</strong> percentage distribution of reposi<strong>to</strong>ry dewatering<br />

during <strong>the</strong> construction phase. During operations, <strong>the</strong> only water expected <strong>to</strong> be discharged from <strong>the</strong> sumps will be <strong>the</strong><br />

infiltration of groundwater from <strong>the</strong> shafts and ventilation shaft condensation.<br />

References:<br />

GOLDER. 2012. Underground Services (WP2-10) Underground Reposi<strong>to</strong>ry Dewatering – Preliminary Estimate of<br />

Groundwater Inflow under Normal Operating Conditions. Golder Associates Ltd. Technical Memorandum No.<br />

1011170042-TM-G2100-0002-02 R02. (CEAA Registry Doc# 695)<br />

Page 2 of 69