13.01.2013 Views

Dames & Moore, 1999 - USDA Forest Service

Dames & Moore, 1999 - USDA Forest Service

Dames & Moore, 1999 - USDA Forest Service

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Dames</strong> & <strong>Moore</strong>, 1998b. Phase I11 Remedial Investigation Quality Assurance Project Plan (QAPP), April<br />

17, 1998. Prepared for Alumet, Inc.<br />

<strong>Dames</strong> &. <strong>Moore</strong>, 1998c. Phase I11 Remedial Investigation Health and Safety Plan, April 17, 1998.<br />

Prepared for Alumet, Inc.<br />

<strong>Dames</strong> & <strong>Moore</strong>, 1998d. Draft Addendum to May 1998 Sampling and Analysis Plan - Benthic<br />

Macroinvertebrate Sampling and Analysis plan, April 27, 1998. Prepared for Alumet, Inc.<br />

<strong>Dames</strong> & <strong>Moore</strong>, 1998e. Addendum to May 1998 Sampling and Analysis Plan - Dye Tracer Sampling<br />

and Analysis Plan, June 5, 1998. Prepared for Alumet, Inc.<br />

<strong>Dames</strong> & <strong>Moore</strong>, 1998f. Sediment Reconnaissance Plan, Lucerne Bar, August 17, 1998. Prepared for<br />

Alumet, Inc.<br />

<strong>Dames</strong> & <strong>Moore</strong>, 1998g. Phase III Remedial Investigation Work Plan Addendum - Downloading<br />

Groundwater 'Leval Data, Lagoon Area Soil Sampling, Backyard Surface Soil Sampling.<br />

Prepared for Alumet, Inc.<br />

<strong>Dames</strong> & <strong>Moore</strong>, 1998h. Phase 111 ~emedial Investigation Work Plan Addendum .2 - Stream Flow<br />

Measurements, Geologic Mapping. September 10, 1998. Prepared for Alumet, Inc.<br />

<strong>Dames</strong> and <strong>Moore</strong>, 1998i. Responses to Agency Comments to Phase I11 RI Draft Sampling and Analysis<br />

Plans, October 5.<br />

<strong>Dames</strong> & <strong>Moore</strong>, l998j. Phase I11 Remedial Investigation Selection of sediment Sampling Reference<br />

Locations, October 7, 1998. Prepared for Alumet, Inc.<br />

<strong>Dames</strong> & <strong>Moore</strong>, 1998k. Phase III Remedial Investigation Suppoiting ,Figures, October 9, 1998.<br />

Prepared for USFS.<br />

. . <strong>Dames</strong> & <strong>Moore</strong>, 1997a. Draft Auril 1997 Surface Water Flow and Water Oualitv Sampling and<br />

Analysis Plan. April 10, 1997. ~01den'~ine Project. Prepared for U.S. <strong>Forest</strong> service - Chelan<br />

Ranger District.<br />

<strong>Dames</strong> & <strong>Moore</strong>, 1997b. Oualitv Assurance/Oualitv Control Proiect Plan (OAPP). April 10, 1997.<br />

Holden Mine Project. Prepared for U.S. <strong>Forest</strong> <strong>Service</strong> - Chelan Ranger District.<br />

<strong>Dames</strong> & <strong>Moore</strong>, 1997c. Health and Safetv Plan, Remedial Investigation Holden Mine. Railroad Creek<br />

Watershed. April 10, 1997. Prepared for U.S. <strong>Forest</strong> <strong>Service</strong> - Chelan Ranger District.<br />

<strong>Dames</strong> & <strong>Moore</strong>, 1997d. Phase I Remedial Investigation A~pendix A - Sampling and Analysis Plan<br />

(SAP). May 13, 1997. Prepared for Alumet, Inc.<br />

<strong>Dames</strong> &.<strong>Moore</strong>, 1997e. Phase I' Remedial Investigation A~pendix B - Oualitv Assurance Proiect Plan<br />

(OAPP). May 13, 1997. Prepared for Alumet, Inc.<br />

H:\l I-0.d~<br />

17693-005-019Uuly 29. <strong>1999</strong>;5:11 PM;DRAI;T FNAL RI REPORT<br />

.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!