Mixing of Seeps with Railroad Creek Water<br />

The seeps flowing into Railroad Creek between station RC-1 and the Copper Creek diversion confluence<br />

(SP23, SP12, SP9, SPll, SP25, SP24, SPIOW, SPIOE) are all acidic to some degree. Therefore,<br />

neutralization will occur upon mixing with the Railroad Creek water. The increase in pH will cause any<br />

remaining aluminum in solution to be precipitated as aluminum hydroxide flocculent. Copper in solution<br />

may precipitate as basic copper carbonate.<br />

6.52 Tailings Piles<br />

6.52.1 Processes in the Tailings Piles<br />

Air Movement<br />

Unlike the underground mine and waste rock piles, oxygen access to the tailings occurs principally by<br />

diffusion. Consequently, seasonal variations in ambient air temperature do not result in transitions<br />

between diffusion and convective air movement (Figure 6.5-11). In tailings deposits, only the<br />

immediately exposed surface of the deposit is usually oxidized because the fine texture limits movement<br />

of air into the mass. However, the fine-grained nature of the tailings results in higher surface areas than<br />

for coarser deposits such as waste rock. During relatively dry periods, oxidation occurs resulting in the<br />

buildup of oxidation products. During wetter periods (typically during snowmelt), saturation of the near<br />

.. surface pores reduces oxygen diffusion but leaches accumulated weathering products.<br />

Water Flow<br />

This section describes the surface water and groundwater transport pathways associated with tailings piles 1,<br />

2, and 3. The conceptual transport pathways are summarized on flow charts presented as Figures 6.5-12<br />

, through 6.5-14. Figure 6.1-3a shows the surface water flow paths over and around the tailings piles.<br />

Figures 6.5-15 and 6.5-16 present conceptual hydrogeologic cross-sections showing anticipated water flow<br />

through and beneath the tailings piles in May and September, respectively.<br />

Surface water infiltrates through the tailings piles as a result of direct precipitation and surface water run-on<br />

from the slopes south of the tailings piles. The potential for infiltration is greatest in the spring when the<br />

snow on the piles and the slopes south of the piles melt, and immediately following significant precipitation<br />

events. The fine-grained nature of the tailings results in relatively low permeability (documented by Hart<br />

Crowser in 1975 and RI data; see Section 4.4-3), which limits the infiltration of water into the piles. The<br />

low permeability of the tailings results in isolated ponding of water on the surfaces of the piles, especially on<br />

tailings piles 2 and 3.<br />

Tailings piles 2 and 3 surface water run-on is collected in ditches on the piles and diverted around tailings<br />

piles 2 and 3 (Figure 6.1-3a). A ditch located adjacent to the upslope access road of tailings pile 3 also<br />

collects and diverts surface water run-on around tailings pile 3. Surface water run-on for tailings pile 1 is<br />

directed into ditches on the pile which convey the run-on to the edges of the piles. The ditches are not lined<br />

and some surface water likely infiltrates into the tailings piles. On tailings pile 1, some of this surface water<br />

is also directed to a decant tower that was observed during the RI to not be completely sealed and provides a<br />

17693005-019Uuly 27.<strong>1999</strong>.4:Il PMDRAFT FINAL RI REPORT