13.01.2013 Views

Dames & Moore, 1999 - USDA Forest Service

Dames & Moore, 1999 - USDA Forest Service

Dames & Moore, 1999 - USDA Forest Service

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

P<br />

a Eastside<br />

U.S. Geological Survey. 1996. Abstracts with Programs . . (Mine Waste Cleanup a National <strong>Forest</strong>).<br />

. . ,,<br />

U.S. Geological Survey. 1996. Characterization of Acid Mine Drainage at the Holden Mine. Chelan<br />

Countv, Washington.<br />

U.S. Geological Survey. 1995. Acid Mine Drainage at the Holden Deposit. Chelan Countv, Washington,<br />

Preliminary Report. U.S. Department of Interior.<br />

U.S. Geological Survey. 1994. Geochemical data and sample locality maps for stream-sediment, heavy<br />

mineral concentrate, mill tailing, water, and precipitate samples collected in and around Holden<br />

Mine, Chelan County, Washington.<br />

U.S. Geological Survey. 1988. Holden Quadrangle, Chelp County, Washington.<br />

U:S. Geological Survey. 1988. Lucerne Quadrangle, Chelan County, Washington.<br />

U.S. Geological survey. 1988. Pinnacle Mountain ~uactran~le, Chelan County, Washington.<br />

U.S. Geological Survey. 1978. Sauk River Quadrangle, Washington.<br />

U.S. Geological Survey. . 1968 (photorevised 1987j.1 Stormy Mountain Quadrangle, Chelan County,<br />

Washington.<br />

U.S. Geological Survey. 1967. Holden Quadrangle, Snohomish and Chelan Counties, Washington.<br />

U.S. Geological Survey. 1967. Lucerne Quadrangle, Chelan County, Washington.<br />

U.S. Geological Survey. 1963 Photorevised 1967). Goode Mountain Quadrangle, Chelan County,<br />

Washington.<br />

U.S.D.A. <strong>Forest</strong> <strong>Service</strong> (USFS). 1998a. Comments on Holden Draft RI/FS Work Plan, March 26.<br />

U.S.D.A. <strong>Forest</strong> <strong>Service</strong> (USFS). 1998b. Preliminary Comments - Phase 11. Remedial Investigation,<br />

Draft Sampling and Analysis Plan and Quality Assurance Project Plan. Prepared by <strong>Dames</strong> &<br />

<strong>Moore</strong>, April 24.<br />

U.S.D.A. <strong>Forest</strong> <strong>Service</strong> (USFS). 1998c. Agency Approval of Alumet's April 27, 1998, Letter Response<br />

to Agency's Preliminary Comments - Phase 111 Draft SAP and QAPP, April 30.<br />

U.S.D.A. <strong>Forest</strong> <strong>Service</strong> (USFS). 1998d. Agency Comments'on Phase 111 Draft Sampling and Analyses<br />

Plans (August 17, 1998, Addendum August 28, 1998, Addendum 2, September 10, 1998).<br />

September 22.<br />

U.S.D.A. <strong>Forest</strong> <strong>Service</strong> (USFS). 1997. Aerial Photographs of the Site Vicinity. Flight Line 9703.<br />

U.S.D.A. <strong>Forest</strong> <strong>Service</strong> (USFS) and U.S. Department of Interior, Bureau of Land Management). 1997.<br />

Draft Environmental Impact Statement 'Volume 1. Interior Columbia Basin Ecosystem<br />

Management Project. [Plus Attachment: Preferred Alternative].<br />

I.(:\I I-0.doc<br />

17693-005-019Wuly 29, <strong>1999</strong>;S:ll PM;DRAFT FINAL RI REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!