surface erosional features provide information to assess the potential for transport of eroded tailings to and<br />

within Railroad Creek.<br />

To further evaluate the potential for flood impacts and erosion within the reach adjacent to the Site during a<br />

hypothetical large flood event, a HEC-2 hydraulic model was developed for the reach with the estimated<br />

100-year flood event routed through the reach from RC-I to RC-2. The input data for the HEC-2 Site<br />

modeling was the HEC-1 basin modeling; the &-1 data and model results are provided in Appendix H.<br />

In summary, areas of potential erosion were identified when hypothetical Railroad Creek flow levels<br />

overtopped protected banks within the reach and flow could not expend energy within a floodplain on the<br />

opposite bank. This condition occurred upstream of the right abutment at the Railroad Creek foot bridge (at<br />

RC-4), at the Copper Creek confluence, and at the left abutment at the Goat Bridge ("Sven's Bridge") (at<br />

RC-2).<br />

Based on the results of the modeling, the water levels within Railroad Creek at the Copper Creek confluence<br />

were elevated due to momentum exchange resulting from Copper Creek entering Railroad Creek at a 90<br />

degree angle. In many places within the reach, the model indicated flow within Railroad Creek to be near or<br />

at "critical velocity." When flow is at or above critical velocity, flow is unstable and disturbances can cause<br />

a "hydraulic jump." Within this type of flow situation, water levels increase through the jump, and<br />

turbulence is extreme, as suggested by the model at the Copper Creek confluence. Because of this, the area<br />

at the junction of Copper Creek and Railroad Creek is susceptible to greater erosion potential than any other<br />

stream segment protected by riprap. During field observations, it was noted that cobbles and other alluvial<br />

sediments had been deposited near the top of the riprap protecting tailings pile 2 immediately downstream<br />

of the Copper Creek confluence. This was the only segment of Railroad Creek on the Site where this was<br />

pbserved and seems to verify the results of the HEC-2 model. At all other locations adjacent to thk tailings,<br />

the predicted water levels appeared to be slightly below the top of the riprap.<br />

A potential concern was identified during field observations of the portion of Copper Creek upstream of the<br />

tailings piles. An old channel of the creek was observed to the west of the existing channel. The abandoned<br />

channel is currently dry, and splits off From the main channel upstream of CC-1 (Figure 4.3-3a). However,<br />

in the event that this channel were to be reoccupied, flow could be directed onto the top of tailings pile 1.<br />

4.3.6.2 Predicted Riprap Size to Prevent Erosion<br />

The following summarizes the results of ofice analyses to estimate the size of the riprap for Railroad Creek<br />

adjacent to the tailings piles in order to prevent erosion during a hypothetical 100-year storm event. The<br />

methods used were based on an average velocity in the channel section for the 100-year event, based on<br />

Hydrologic Engineering Center-River Analysis System (HEC-RAS) model output and depth and slope<br />

method From the Soil Conservation <strong>Service</strong> (SCS, 1975). The baseline data included channel width, depth,<br />

side slope, average channel velocity and slope. These data were obtained in the field and from HEC-RAS<br />

hydraulic modeling results.<br />

Average Stream Velocity Equations Method<br />

The following equations were used to estimate the average riprap rock size (DSO) in feet'based on average<br />

channel velocity (Blodgett and McConaughy, 1986). The average channel velocity along tailings piles 2<br />

G:\WPDATA\OOJ\REPORTSWOL~EN-~UU\~~~DOC<br />

17693-005-019Uuly 19. <strong>1999</strong>:4:51 PM;DRAFT FINAL RI REPORT