20.01.2013 Views

Designing e-Government for the Poor - Tanzania Development ...

Designing e-Government for the Poor - Tanzania Development ...

Designing e-Government for the Poor - Tanzania Development ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

92<br />

Bangladesh<br />

II. ISSUES<br />

• Lack of telecommunications infrastructure<br />

• Low literacy rate<br />

• Low ICT literacy rate<br />

• Political instability<br />

• Lack of awareness<br />

• Lack of technology and resources<br />

• Absence of initiatives<br />

III. THE PROPOSED PROJECT<br />

A. Objective and scope<br />

The proposed project is to establish 10 e-village community centres.<br />

The objective of <strong>the</strong> project is to empower rural people by increasing ICT<br />

accessibility and providing ICT applications to be utilized <strong>for</strong> <strong>the</strong>ir socioeconomic<br />

activities.<br />

Bangladesh consists of six administrative divisions varying in size,<br />

population, and geographical nature. Two community e-centres (CeCs) will<br />

be established in each of Dhaka, Chittagong, Rajshahi, Khulna divisions,<br />

and one CeCs will be established in each of Sylhet and Barisal divisions.<br />

Needs assessment will be conducted to select locations <strong>for</strong> <strong>the</strong> e-community<br />

centres. Existing national initiatives, resources, and services relevant to<br />

community in<strong>for</strong>mation will be identified. ICT applications and local contents<br />

<strong>for</strong> local communities will be developed, and operators of <strong>the</strong> centres<br />

will be selected. Projects will be on a pilot basis, and if <strong>the</strong> per<strong>for</strong>mance of<br />

<strong>the</strong>se are found satisfactory, more projects may be undertaken.<br />

B. Cost estimates and financing plan<br />

The cost estimates refer to <strong>the</strong> amount necessary <strong>for</strong> a period of two<br />

years <strong>for</strong> one centre.<br />

COST ESTIMATES<br />

(US$ million)<br />

Item Quantity <strong>Government</strong> Donors Total cost<br />

1. Consultants 1 <strong>for</strong> 6<br />

a. International consultant months 0.00 0.05 0.05<br />

b. Domestic consultants 0.00 0.006 0.006<br />

2. Manpower 0.0048 0.00 0.0048<br />

3. Equipment and software 0.00 0.024558 0.024558<br />

a. Equipment<br />

b. Software

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!