Designing e-Government for the Poor - Tanzania Development ...
Designing e-Government for the Poor - Tanzania Development ...
Designing e-Government for the Poor - Tanzania Development ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
170<br />
Thailand<br />
III. THE PROPOSED PROJECT<br />
A. Objective and scope<br />
Due to significant discrepancy in economic status between <strong>the</strong> rural<br />
and urban areas, new ICT projects should be implemented and geared at<br />
<strong>the</strong> grass-roots level. Rural people should be encouraged to operate <strong>the</strong><br />
projects and acquire business management skills. The proposed project has<br />
three components. They are:<br />
1. Telecentre – business centre focusing on <strong>the</strong> activities at home,<br />
or used as community centre.<br />
2. Tourism in<strong>for</strong>mation network – consists of back office and front<br />
office systems. Data will be sent to <strong>the</strong> operation centre at <strong>the</strong><br />
Prime Ministers Office <strong>for</strong> analysis.<br />
3. Human network – includes <strong>the</strong> government, private sector (travel<br />
company), educational institutes and local community.<br />
The project will be implemented as a pilot programme in villages<br />
across five regions of Thailand. Specific criteria to evaluate <strong>the</strong> standard<br />
of <strong>the</strong> home stay accommodation such as clean water, clean room, point<br />
of sales (e.g. One Tambon One Product (OTOP), activities) will be devised.<br />
Training courses, including ICT training, will be provided according<br />
to <strong>the</strong> needs of <strong>the</strong> villagers, and <strong>the</strong> standard of <strong>the</strong> home stay<br />
services. The number of potential villages will be about 3,000 villages<br />
located in 7,400 districts that have high potential to serve as tourist<br />
destinations.<br />
B. Cost estimates and financing plan<br />
COST ESTIMATES<br />
(US$ million)<br />
Item <strong>Government</strong> Donors Total cost<br />
1. Consultants<br />
a. International consultants (business<br />
model)<br />
0.00 1.00 1.00<br />
b. Domestic consultants (logistics,<br />
local development)<br />
1.00 0.00 1.00<br />
2. Equipment and software<br />
a. Equipment (3 years) 8.50 0.00 8.50<br />
b. Software (local software-off <strong>the</strong> shelf) 0.13 0.00 0.13<br />
3. Building and furniture<br />
a. Buildings (rent 5 years) 1.25 0.00 1.25<br />
b. Furniture 0.20 0.00 0.20<br />
4. Training, seminars and conferences 0.25 0.25 0.50