Design Per<strong>for</strong>mance Monitoring Assumptions<br />
summary indicators/targets mechanism and risks<br />
Support <strong>for</strong> proper<br />
monitoring and<br />
evaluation system<br />
Access to electronic<br />
data based improved<br />
Outputs<br />
Vertical and<br />
horizontal<br />
networking<br />
established<br />
Local governance<br />
portal created<br />
Capacity of local<br />
bodies streng<strong>the</strong>ned<br />
Spatial planning and<br />
monitoring system<br />
improved<br />
Database system<br />
established<br />
Institutional setup<br />
of local bodies<br />
developed<br />
Research pursued<br />
Key Milestones<br />
PMU established<br />
PSC Formulated<br />
PIU created<br />
National and<br />
international personnel<br />
commissioned<br />
Tools and equipment<br />
procured<br />
Point of presence<br />
(POP) prepared and<br />
implemented in each<br />
project site<br />
At least 80 per cent<br />
of local bodies feel<br />
supporting in <strong>the</strong>ir<br />
planning process<br />
80 per cent of local<br />
bodies have access to<br />
electronic database<br />
60 per cent of<br />
district and<br />
unicipality linked<br />
with <strong>the</strong> MLD<br />
25 per cent of total<br />
users benefited from<br />
government portal<br />
One third of <strong>the</strong><br />
project district<br />
connected through<br />
Intranet<br />
At least 50 per cent<br />
of staffs trained<br />
At least 80 per cent<br />
of local bodies<br />
report database<br />
established<br />
At least 5 best<br />
practices shared<br />
from each districts<br />
Number of district<br />
connected with net<br />
work<br />
Number of soft ware<br />
developed and<br />
adopted<br />
Project staff and<br />
office established<br />
Number of staffed<br />
trained<br />
Project monitoring<br />
and evaluation<br />
system<br />
Participatory<br />
monitoring system<br />
Annual statement<br />
of local bodies<br />
Participatory<br />
monitoring and<br />
evaluation<br />
Progress report and<br />
disbursement report<br />
Web site publication<br />
Print media<br />
Achievement book<br />
Evaluation report<br />
Nepal<br />
Adequate funding<br />
and policy backing<br />
would be continued<br />
Willingness of local<br />
bodies to participate<br />
and adapt<br />
<strong>Government</strong><br />
maintains conducive<br />
environment<br />
(continuation of<br />
laws and regulation)<br />
147