Indonesia<br />
Stage C: Commissioning Stage (3 month)<br />
• Training <strong>the</strong> NGO in determining work practice<br />
• On-going training (every day – morning)<br />
Stage D: Monitor and Review Process (12 months)<br />
• Conduct review of process using a predetermined set of review<br />
measures<br />
• Modify<br />
measures<br />
model and CAP site operations to reflect <strong>the</strong><br />
• Measure sustainability of <strong>the</strong> CAP site<br />
B. Cost estimate and financing plan<br />
Cost components:<br />
• International consultants. This will be required at <strong>the</strong> start of<br />
<strong>the</strong> project to oversee <strong>the</strong> overall plan (implementation and<br />
review) and provide quality assurances input. These resources<br />
will be shared across <strong>the</strong> two hundred (200) locations.<br />
• Domestic consultants. This will be done through engaging a<br />
non-governmental organization. It will oversee <strong>the</strong> implementation<br />
and <strong>the</strong> review of <strong>the</strong> project.<br />
• Equipment. As described in <strong>the</strong> model above.<br />
• Software. As described in <strong>the</strong> model above.<br />
• Building. There will be costs <strong>for</strong> building, fixing or modifying<br />
<strong>the</strong> building.<br />
• Furniture. Furniture will be required <strong>for</strong> <strong>the</strong> 400 computers<br />
(table and chairs), <strong>the</strong> facilitator’s computer, printers and fax,<br />
teaching board (white board).<br />
• Training, seminars and conferences. For <strong>the</strong> site, <strong>the</strong>re will<br />
be an ongoing training everyday (or every o<strong>the</strong>r day) conducted<br />
by <strong>the</strong> NGO. That is why <strong>the</strong> training will be given to <strong>the</strong> NGO<br />
(train-<strong>the</strong>-trainer mode). After one (1) year, <strong>the</strong>re will be a<br />
seminar held to display <strong>the</strong> implementation results held in<br />
Jakarta.<br />
• Research, development and surveys. Research will be<br />
conducted in conjunction with an Indonesian university and<br />
donor. Surveys and o<strong>the</strong>r research instruments will be used<br />
accordingly.<br />
119