- Page 4 and 5: ii Designing e-Government for the P
- Page 7 and 8: Contents Contents Page Preface ....
- Page 9 and 10: Contents (Continued) Contents Page
- Page 11 and 12: Abbreviations (Continued) DMIS Dece
- Page 13: Abbreviations (Continued) RCC Rajsh
- Page 17 and 18: I. ORGANIZATION OF THE WORKSHOP A.
- Page 19 and 20: E. Election of officers The Worksho
- Page 21 and 22: Enabling local governments to offer
- Page 23 and 24: Enabling local governments to offer
- Page 25 and 26: Maximizing participation: designing
- Page 27 and 28: Maximizing participation: designing
- Page 29 and 30: Stakeholder participation in design
- Page 31 and 32: Stakeholder participation in design
- Page 33 and 34: Stakeholder participation in design
- Page 35 and 36: Developing local e-government porta
- Page 37 and 38: Citizen-centric e-government: empow
- Page 39 and 40: Citizen-centric e-government: empow
- Page 41 and 42: Preparing a project proposal for ex
- Page 43 and 44: Job training and job placement serv
- Page 45 and 46: Job training and job placement serv
- Page 47 and 48: E-government and the digital divide
- Page 49 and 50: Building e-government in Japan Figu
- Page 51 and 52: Methods of assessing the informatio
- Page 53 and 54:
Methods of assessing the informatio
- Page 55 and 56:
Conducive policy environment for e-
- Page 57 and 58:
The challenge of implementing e-gov
- Page 59 and 60:
The challenge of implementing e-gov
- Page 61 and 62:
Public key infrastructure initiativ
- Page 63:
Public key infrastructure initiativ
- Page 67 and 68:
SUMMARY OF COUNTRY REPORTS On the f
- Page 69 and 70:
The Golden Projects are China’s t
- Page 71 and 72:
Laboratory (OSOL)” for all school
- Page 73 and 74:
of satellite technology, and the Mi
- Page 75 and 76:
K. Philippines Summary of Country R
- Page 77 and 78:
document (ID) cards, the reengineer
- Page 79:
ANNEXES
- Page 82 and 83:
68 Annex I: Workshop Agenda 13:00 -
- Page 84 and 85:
70 Annex I: Workshop Agenda A. Grou
- Page 86 and 87:
72 Annex I: Workshop Agenda Group 4
- Page 89 and 90:
LIST OF PARTICIPANTS Annex II: List
- Page 91 and 92:
Annex II: List of Participants PAKI
- Page 93 and 94:
Mr. Shuichi Takano, Director, Admin
- Page 95 and 96:
Annex III: Summary of Action Plans/
- Page 97 and 98:
Bangladesh delayed. All departments
- Page 99 and 100:
Bangladesh formed. The technical co
- Page 101 and 102:
Design Performance Monitoring Assum
- Page 103 and 104:
• Establishment of communication
- Page 105 and 106:
Bangladesh Title: E-village communi
- Page 107 and 108:
Item Quantity Government Donors Tot
- Page 109 and 110:
Design Performance Monitoring Assum
- Page 111 and 112:
single window, and enhance efficien
- Page 113 and 114:
F. Risks • Lack of will to implem
- Page 115 and 116:
Title: E-school and family linkage
- Page 117 and 118:
The implementation schedule is as f
- Page 119 and 120:
Title: SIKKIM e-government project
- Page 121 and 122:
3. Finalization of funding arrangem
- Page 123 and 124:
Design Performance Monitoring Assum
- Page 125 and 126:
to be implemented. In addition, the
- Page 127 and 128:
Indonesia During the implementation
- Page 129 and 130:
F. Risks The sustainability of the
- Page 131 and 132:
Indonesia been done before. This is
- Page 133 and 134:
Indonesia Stage C: Commissioning St
- Page 135 and 136:
Indonesia • To bring economical b
- Page 137 and 138:
• Improved communication among do
- Page 139 and 140:
Title: E-government project proposa
- Page 141 and 142:
PROJECT SCHEDULE Lao People’s Dem
- Page 143 and 144:
Design Performance Monitoring Assum
- Page 145 and 146:
III. PROPOSED PROJECT A. Objectives
- Page 147 and 148:
logical tools will improve the qual
- Page 149 and 150:
print and Roadmap in Mongolia” fu
- Page 151 and 152:
Project name Period Government Dono
- Page 153 and 154:
Myanmar Title: Connecting rural Mya
- Page 155 and 156:
Myanmar C. Implementation arrangeme
- Page 157 and 158:
Nepal • Inadequate networking/con
- Page 159 and 160:
Outputs Local Foreign currency exch
- Page 161 and 162:
Design Performance Monitoring Assum
- Page 163 and 164:
Title: Rural information centre (RI
- Page 165 and 166:
C. Implementation arrangements The
- Page 167 and 168:
Pakistan Title: Baseline e-governme
- Page 169 and 170:
• Reduced number of visits to the
- Page 171 and 172:
Pakistan • Ability to track the s
- Page 173 and 174:
Philippines III. PROPOSED PROJECT T
- Page 175 and 176:
financial independence. It will als
- Page 177 and 178:
citizens have to visit several gove
- Page 179 and 180:
9. Deputy Inspector General (IT), P
- Page 181 and 182:
Design Performance Monitoring Assum
- Page 183 and 184:
Thailand Title: Building a tourism
- Page 185 and 186:
Item Government Donors Total cost 5
- Page 187 and 188:
Design Performance Monitoring Assum
- Page 189 and 190:
The project will consist of the fol
- Page 191 and 192:
Design Performance Monitoring Assum
- Page 193 and 194:
Uzbekistan III. PROPOSED PROJECT A.
- Page 195 and 196:
The external infrastructure covers
- Page 197 and 198:
Viet Nam telephones and Internet us
- Page 199:
United Nations publication Sales No