- Page 3 and 4:
ECONOMIC AND SOCIAL COMMISSION FOR
- Page 5:
PREFACE Preface In recent years, th
- Page 8 and 9:
vi Contents Contents (Continued) Pa
- Page 10 and 11:
viii Abbreviations Abbreviations AB
- Page 12 and 13:
x Abbreviations Abbreviations (Cont
- Page 15: PART ONE Summary of the Workshop
- Page 18 and 19: 4 Organization of the Workshop C. O
- Page 20 and 21: 6 Organization of the Workshop 22.
- Page 22 and 23: 8 Enabling local governments to off
- Page 24 and 25: 10 Maximizing participation: design
- Page 26 and 27: 12 Maximizing participation: design
- Page 28 and 29: 14 Maximizing participation: design
- Page 30 and 31: 16 Stakeholder participation in des
- Page 32 and 33: 18 Stakeholder participation in des
- Page 34 and 35: 20 Developing local e-government po
- Page 36 and 37: 22 Citizen-centric e-government: em
- Page 38 and 39: 24 Citizen-centric e-government: em
- Page 40 and 41: 26 Preparing a project proposal for
- Page 42 and 43: 28 Preparing a project proposal for
- Page 44 and 45: 30 Job training and job placement s
- Page 46 and 47: 32 E-government and the digital div
- Page 48 and 49: 34 Building e-government in Japan g
- Page 50 and 51: 36 Building e-government in Japan T
- Page 52 and 53: 38 Methods of assessing the informa
- Page 54 and 55: 40 Conducive policy environment for
- Page 56 and 57: 42 Conducive policy environment for
- Page 58 and 59: 44 The challenge of implementing e-
- Page 60 and 61: 46 Public key infrastructure initia
- Page 62 and 63: 48 Public key infrastructure initia
- Page 67 and 68: SUMMARY OF COUNTRY REPORTS On the f
- Page 69 and 70: The Golden Projects are China’s t
- Page 71 and 72: Laboratory (OSOL)” for all school
- Page 73 and 74: of satellite technology, and the Mi
- Page 75 and 76: K. Philippines Summary of Country R
- Page 77 and 78: document (ID) cards, the reengineer
- Page 79: ANNEXES
- Page 82 and 83: 68 Annex I: Workshop Agenda 13:00 -
- Page 84 and 85: 70 Annex I: Workshop Agenda A. Grou
- Page 86 and 87: 72 Annex I: Workshop Agenda Group 4
- Page 89 and 90: LIST OF PARTICIPANTS Annex II: List
- Page 91 and 92: Annex II: List of Participants PAKI
- Page 93 and 94: Mr. Shuichi Takano, Director, Admin
- Page 95 and 96: Annex III: Summary of Action Plans/
- Page 97 and 98: Bangladesh delayed. All departments
- Page 99 and 100: Bangladesh formed. The technical co
- Page 101 and 102: Design Performance Monitoring Assum
- Page 103 and 104: • Establishment of communication
- Page 105 and 106: Bangladesh Title: E-village communi
- Page 107 and 108: Item Quantity Government Donors Tot
- Page 109 and 110: Design Performance Monitoring Assum
- Page 111 and 112: single window, and enhance efficien
- Page 113 and 114: F. Risks • Lack of will to implem
- Page 115 and 116:
Title: E-school and family linkage
- Page 117 and 118:
The implementation schedule is as f
- Page 119 and 120:
Title: SIKKIM e-government project
- Page 121 and 122:
3. Finalization of funding arrangem
- Page 123 and 124:
Design Performance Monitoring Assum
- Page 125 and 126:
to be implemented. In addition, the
- Page 127 and 128:
Indonesia During the implementation
- Page 129 and 130:
F. Risks The sustainability of the
- Page 131 and 132:
Indonesia been done before. This is
- Page 133 and 134:
Indonesia Stage C: Commissioning St
- Page 135 and 136:
Indonesia • To bring economical b
- Page 137 and 138:
• Improved communication among do
- Page 139 and 140:
Title: E-government project proposa
- Page 141 and 142:
PROJECT SCHEDULE Lao People’s Dem
- Page 143 and 144:
Design Performance Monitoring Assum
- Page 145 and 146:
III. PROPOSED PROJECT A. Objectives
- Page 147 and 148:
logical tools will improve the qual
- Page 149 and 150:
print and Roadmap in Mongolia” fu
- Page 151 and 152:
Project name Period Government Dono
- Page 153 and 154:
Myanmar Title: Connecting rural Mya
- Page 155 and 156:
Myanmar C. Implementation arrangeme
- Page 157 and 158:
Nepal • Inadequate networking/con
- Page 159 and 160:
Outputs Local Foreign currency exch
- Page 161 and 162:
Design Performance Monitoring Assum
- Page 163 and 164:
Title: Rural information centre (RI
- Page 165 and 166:
C. Implementation arrangements The
- Page 167 and 168:
Pakistan Title: Baseline e-governme
- Page 169 and 170:
• Reduced number of visits to the
- Page 171 and 172:
Pakistan • Ability to track the s
- Page 173 and 174:
Philippines III. PROPOSED PROJECT T
- Page 175 and 176:
financial independence. It will als
- Page 177 and 178:
citizens have to visit several gove
- Page 179 and 180:
9. Deputy Inspector General (IT), P
- Page 181 and 182:
Design Performance Monitoring Assum
- Page 183 and 184:
Thailand Title: Building a tourism
- Page 185 and 186:
Item Government Donors Total cost 5
- Page 187 and 188:
Design Performance Monitoring Assum
- Page 189 and 190:
The project will consist of the fol
- Page 191 and 192:
Design Performance Monitoring Assum
- Page 193 and 194:
Uzbekistan III. PROPOSED PROJECT A.
- Page 195 and 196:
The external infrastructure covers
- Page 197 and 198:
Viet Nam telephones and Internet us
- Page 199:
United Nations publication Sales No