164<br />
Sri Lanka<br />
build <strong>the</strong> relevant layers of <strong>the</strong> GIS system. The third phase will reengineer<br />
and automate <strong>the</strong> land related services offered by government<br />
organizations. The utility and basic service providers such as <strong>the</strong> Police<br />
Department, Fire Service and Ambulance Services will also automate <strong>the</strong>ir<br />
in<strong>for</strong>mation systems to leverage on <strong>the</strong> GIS in<strong>for</strong>mation.’<br />
B. Cost estimate and financing plan<br />
COST ESTIMATES<br />
($US million)<br />
Item <strong>Government</strong> Donors Total cost<br />
1. Consultants<br />
a. International consultants 0.2 1.0 1.2<br />
b. Domestic consultants 1.2 0.8 2.0<br />
2. Equipment and software<br />
a. Equipment 1.4 9.8 11.2<br />
b. Software 3.5 24.0 27.5<br />
3. Buildings and furniture<br />
a. Buildings 0.1 0.3 0.4<br />
b. Furniture 0.1 0.2 0.3<br />
4. Training, seminars and conferences 0.1 0.2 0.3<br />
5. Research, development and surveys 0.0 0.2 0.2<br />
6. Miscellaneous administration and support<br />
costs<br />
0.1 0.1 0.2<br />
7. Contingencies 0.5 1.0 1.5<br />
Total 7.2 37.6 44.8<br />
C. Implementation arrangements<br />
ICTA will play <strong>the</strong> role of facilitator and mediator by leading <strong>the</strong><br />
initial discussion of <strong>the</strong> project. Once <strong>the</strong> stakeholders have reached an<br />
agreement on <strong>the</strong> project concept, ICTA will address <strong>the</strong> issue of financing<br />
by submitting <strong>the</strong> project proposal and securing funds. A Steering Committee<br />
should be appointed to make policy decisions <strong>for</strong> <strong>the</strong> project, and guide<br />
<strong>the</strong> project team. The members of <strong>the</strong> Steering Committee should include,<br />
but not limited to:<br />
1. Secretary, Ministry of Home Affairs and Local <strong>Government</strong><br />
2. Register General<br />
3. Surveyor General<br />
4. Mayor, Municipal Council, Colombo<br />
5. Chairman, Urban Council, Moratuwa<br />
6 Chairman, Pradesheeya Sabha, Baththaramulla,<br />
7. Assistant Director-General (IT), Cylon Electricity Board<br />
8. Assistant Director-General (IT), Water <strong>Development</strong> Board