1 BACKGROUND<br />
0BInvestment Evaluation Summary<br />
TNM-GS-809-0720<br />
Palmerston Substation 110 kV is critical to ensuring a secure and reliable electricity connection point for customers and<br />
generators in northern Tasmania. Palmerston Substation 110 kV provides:<br />
� an interconnection to Palmerston Substation 220 kV via a 200 MVA auto-transformer;<br />
� two transmission lines to Hadspen Substation;<br />
� an interconnection to Waddamana Substation in southern Tasmania;<br />
� a radial supply to Avoca and St Marys substations;<br />
� a radial supply to Arthurs Lake Substation;<br />
� two 110/22 kV connections to Aurora Energy; and<br />
� two connections to Hydro Tasmania’s Poatina power station.<br />
Figure 1 presents the schematic diagram of the northern Tasmanian transmission network that connects to Palmerston<br />
Substation.<br />
Figure 1 - Northern area transmission network schematic diagram<br />
SHEFFIELD<br />
GEORGE TOWN<br />
The majority of the existing 110 kV assets in service at Palmerston Substation were installed when the 110 kV<br />
switchyard at Palmerston Substation was commissioned in 1963.<br />
2 PROJECT OVERVIEW<br />
PALMERSTON<br />
HADSPEN<br />
ARTHURS LAKE<br />
TREVALLYN MOWBRAY<br />
NORWOOD<br />
AVOCA<br />
SCOTTSDALE<br />
ST. MARYS<br />
The planned redevelopment of Palmerston Substation 110 kV primarily includes the replacement of circuit breakers,<br />
voltage transformers, post insulators, and selected protection and control equipment. The substation redevelopment will<br />
address the identified safety issues and improve the security and reliability of electricity supply by replacing assets that<br />
are in poor condition and susceptible to failure.<br />
This project includes the following major works at Palmerston Substation 110 kV:<br />
� replacement of 11 Reyrolle type 110/OS/10 circuit breakers with dead tank circuit breakers that have integral current<br />
transformers;<br />
� refurbishment of 28 disconnectors including replacement of the multi-piece post insulators;<br />
© <strong>Transend</strong> Networks Pty Ltd 3 of 13<br />
DERBY