1 BACKGROUND<br />

0BInvestment Evaluation Summary<br />

TNM-GS-809-0720<br />

Palmerston Substation 110 kV is critical to ensuring a secure and reliable electricity connection point for customers and<br />

generators in northern Tasmania. Palmerston Substation 110 kV provides:<br />

� an interconnection to Palmerston Substation 220 kV via a 200 MVA auto-transformer;<br />

� two transmission lines to Hadspen Substation;<br />

� an interconnection to Waddamana Substation in southern Tasmania;<br />

� a radial supply to Avoca and St Marys substations;<br />

� a radial supply to Arthurs Lake Substation;<br />

� two 110/22 kV connections to Aurora Energy; and<br />

� two connections to Hydro Tasmania’s Poatina power station.<br />

Figure 1 presents the schematic diagram of the northern Tasmanian transmission network that connects to Palmerston<br />

Substation.<br />

Figure 1 - Northern area transmission network schematic diagram<br />

SHEFFIELD<br />

GEORGE TOWN<br />

The majority of the existing 110 kV assets in service at Palmerston Substation were installed when the 110 kV<br />

switchyard at Palmerston Substation was commissioned in 1963.<br />

2 PROJECT OVERVIEW<br />

PALMERSTON<br />

HADSPEN<br />

ARTHURS LAKE<br />

TREVALLYN MOWBRAY<br />

NORWOOD<br />

AVOCA<br />

SCOTTSDALE<br />

ST. MARYS<br />

The planned redevelopment of Palmerston Substation 110 kV primarily includes the replacement of circuit breakers,<br />

voltage transformers, post insulators, and selected protection and control equipment. The substation redevelopment will<br />

address the identified safety issues and improve the security and reliability of electricity supply by replacing assets that<br />

are in poor condition and susceptible to failure.<br />

This project includes the following major works at Palmerston Substation 110 kV:<br />

� replacement of 11 Reyrolle type 110/OS/10 circuit breakers with dead tank circuit breakers that have integral current<br />

transformers;<br />

� refurbishment of 28 disconnectors including replacement of the multi-piece post insulators;<br />

© <strong>Transend</strong> Networks Pty Ltd 3 of 13<br />