CONTENTS<br />
0BInvestment Evaluation Summary<br />
TNM-GS-809-0720<br />
CONTENTS 2<br />
1 BACKGROUND 3<br />
2 PROJECT OVERVIEW 4<br />
3 PROJECT TIMING 5<br />
4 INVESTMENT NEED 5<br />
4.1 SUMMARY.......................................................................................................................................................... 5<br />
4.2 SUPPLY TRANSFORMERS .................................................................................................................................... 5<br />
4.3 CIRCUIT BREAKER.............................................................................................................................................. 5<br />
4.4 CURRENT TRANSFORMERS ................................................................................................................................. 6<br />
4.5 HIGH VOLTAGE ASSETS...................................................................................................................................... 6<br />
4.6 PROTECTION AND CONTROL SYSTEMS................................................................................................................ 7<br />
4.7 OIL CONTAINMENT............................................................................................................................................. 7<br />
5 CUSTOMER CONSULTATION 8<br />
6 BENEFITS 8<br />
7 OPTIONS ANALYSIS 8<br />
7.1 OPTION 1: STAGED REDEVELOPMENT................................................................................................................. 8<br />
7.2 OPTION 2 - REPLACE SELECTED ASSETS IN-SITU ................................................................................................. 9<br />
7.3 OPTION 3 - REPLACE ALL ASSETS IN-SITU......................................................................................................... 10<br />
7.4 OPTION 4 - REPLACE ALL ASSETS AT A GREENFIELD LOCATION ....................................................................... 11<br />
8 OPTION ESTIMATES 11<br />
9 PREFERRED OPTION 12<br />
© <strong>Transend</strong> Networks Pty Ltd 2 of 12