Figure 3 - Explosive failure of a Ducon 110 kV voltage transformer at Avoca Substation<br />

0BInvestment Evaluation Summary<br />

TNM-GS-809-0720<br />

Ducon voltage transformers that were manufactured prior to 1973 incorporated a unique system where a neoprene rubber<br />

gasket was encased within a lead sheath to protect the rubber from the insulating oil. As the units age, the lead sheath<br />

becomes susceptible to creeping inward causing lead to fall inside the unit, or the rubber to be exposed to the insulating<br />

oil which hardens the rubber and results in deterioration of the oil seal.<br />

The average annual preventive maintenance costs associated with 110 kV voltage transformers at Palmerston Substation<br />

is $5,500 per three phase set.<br />

The EHV Voltage Transformer Asset Management Plan (TNM-PL-809-0614) recommends that Ducon voltage<br />

transformers at Palmerston Substation be replaced. The Ducon voltage transformers will be 51 years old when<br />

decommissioned.<br />

Reyrolle voltage transformers<br />

The Reyrolle type KP5323 110 kV voltage transformer at Palmerston Substation was manufactured in 1957 and is the<br />

last unit of this type in the transmission network. The EHV Voltage Transformer Asset Management Plan (TNM-PL-<br />

809-0614) recommends that the Reyrolle voltage transformer at Palmerston Substation be replaced. The unit will be<br />

57 years old when it is decommissioned.<br />

Line voltage transformers<br />

This project includes the installation of voltage transformers on each of the 110 kV transmission lines that connect to<br />

Palmerston Substation 110 kV to improve the reliability of electricity supply and to reduce the complexity of the<br />

associated transmission line protection schemes. Further details of the line voltage transformer installation program and<br />

the units that will be installed at Palmerston Substation 110 kV are provided in the Voltage Transformer Asset<br />

Management Plan (TNM-PL-809-00614).<br />