Table 1 - Summary of economic analysis of options<br />

0BInvestment Evaluation Summary<br />

TNM-GS-809-0720<br />

Option Net present value of costs ($M June 2007)<br />

1. Maintain existing assets and defer replacement $1.97<br />

2. Replace selected assets in-situ $1.91<br />

3. Replace all assets in-situ $1.98<br />

4. Replace all assets in a Greenfield location $3.62<br />

The economic analysis includes the cost impact to customers in the event of a major circuit breaker failure using a<br />

probabilistic approach based on current and forecast load data the transmission circuit connected to Arthurs Lake<br />

Substation.<br />

9 PREFERRED OPTION<br />

Option 2 is preferred because it addresses the issues identified in section 4 at the least cost.<br />