Table 1 - Summary of economic analysis of options<br />
0BInvestment Evaluation Summary<br />
TNM-GS-809-0720<br />
Option Net present value of costs ($M June 2007)<br />
1. Maintain existing assets and defer replacement $1.97<br />
2. Replace selected assets in-situ $1.91<br />
3. Replace all assets in-situ $1.98<br />
4. Replace all assets in a Greenfield location $3.62<br />
The economic analysis includes the cost impact to customers in the event of a major circuit breaker failure using a<br />
probabilistic approach based on current and forecast load data the transmission circuit connected to Arthurs Lake<br />
Substation.<br />
9 PREFERRED OPTION<br />
Option 2 is preferred because it addresses the issues identified in section 4 at the least cost.<br />
© <strong>Transend</strong> Networks Pty Ltd 12 of 12