- Page 1:
APPENDIX 5 Transend, Renewal capita
- Page 4 and 5:
Renewal Capital Expenditure TNM-GR-
- Page 6 and 7:
Renewal Capital Expenditure TNM-GR-
- Page 8 and 9:
Renewal Capital Expenditure TNM-GR-
- Page 10 and 11:
Renewal Capital Expenditure TNM-GR-
- Page 12 and 13:
Renewal Capital Expenditure TNM-GR-
- Page 14 and 15:
Figure 4 - Overview of the Reyrolle
- Page 16 and 17:
Table 3 - Circuit criticality ratin
- Page 18 and 19:
Figure 6 - Capacitive voltage trans
- Page 20 and 21:
Current transformer make / type Mod
- Page 22 and 23:
1.6.5 Protection and control Renewa
- Page 24 and 25:
Renewal Capital Expenditure TNM-GR-
- Page 26 and 27:
Renewal Capital Expenditure TNM-GR-
- Page 28 and 29:
Renewal Capital Expenditure TNM-GR-
- Page 30 and 31:
Renewal Capital Expenditure TNM-GR-
- Page 32 and 33:
CONTENTS 0BInvestment Evaluation Su
- Page 34 and 35:
0BInvestment Evaluation Summary TNM
- Page 36 and 37: 0BInvestment Evaluation Summary TNM
- Page 38 and 39: 5 CUSTOMER CONSULTATION 0BInvestmen
- Page 40 and 41: � implementation of revised maint
- Page 42 and 43: Table 1 - Summary of economic analy
- Page 44 and 45: CONTENTS 0BInvestment Evaluation Su
- Page 46 and 47: 0BInvestment Evaluation Summary TNM
- Page 48 and 49: 0BInvestment Evaluation Summary TNM
- Page 50 and 51: 0BInvestment Evaluation Summary TNM
- Page 52 and 53: 7.3 OPTION 3 - STAGED REPLACEMENT O
- Page 54 and 55: 0BInvestment Evaluation Summary TNM
- Page 56 and 57: CONTENTS 0BInvestment Evaluation Su
- Page 58 and 59: 0BInvestment Evaluation Summary TNM
- Page 60 and 61: 0BInvestment Evaluation Summary TNM
- Page 62 and 63: 4.8 BUS CONDUCTOR AND FITTINGS 0BIn
- Page 64 and 65: 6 BENEFITS The direct benefits of r
- Page 66 and 67: 7.2.3 DRAWBACKS The option has the
- Page 68 and 69: Figure 2 - Option 3: single line di
- Page 70 and 71: This option includes: � installin
- Page 73 and 74: INVESTMENT EVALUATION SUMMARY 0BInv
- Page 75 and 76: 1 BACKGROUND 0BInvestment Evaluatio
- Page 77 and 78: 4.1 CIRCUIT BREAKERS 0BInvestment E
- Page 79 and 80: 0BInvestment Evaluation Summary TNM
- Page 81 and 82: � reduced burden on spare parts m
- Page 83 and 84: 0BInvestment Evaluation Summary TNM
- Page 85: 0BInvestment Evaluation Summary TNM
- Page 89 and 90: 1 BACKGROUND 0BInvestment Evaluatio
- Page 91 and 92: 4.1 CIRCUIT BREAKERS 0BInvestment E
- Page 93 and 94: 4.3 CURRENT TRANSFORMERS 0BInvestme
- Page 95 and 96: 0BInvestment Evaluation Summary TNM
- Page 97 and 98: 7.1.4 CONCLUSION 0BInvestment Evalu
- Page 99 and 100: INVESTMENT EVALUATION SUMMARY 0BInv
- Page 101 and 102: 1 BACKGROUND 0BInvestment Evaluatio
- Page 103 and 104: 4 INVESTMENT NEED 0BInvestment Eval
- Page 105 and 106: Figure 3 - Explosive failure of a D
- Page 107 and 108: Palmerston-Arthurs Lake 110 kV tran
- Page 109 and 110: 0BInvestment Evaluation Summary TNM
- Page 111: 7.4.4 CONCLUSION This option is tec
- Page 114 and 115: CONTENTS 0BInvestment Evaluation Su
- Page 116 and 117: 0BInvestment Evaluation Summary TNM
- Page 118 and 119: 0BInvestment Evaluation Summary TNM
- Page 120 and 121: 0BInvestment Evaluation Summary TNM
- Page 122 and 123: 4.6 BUS CONDUCTOR AND FITTINGS 0BIn
- Page 124 and 125: 0BInvestment Evaluation Summary TNM
- Page 126 and 127: Table 1 - Cost comparison of option
- Page 129 and 130: INVESTMENT EVALUATION SUMMARY TITLE
- Page 131 and 132: 1 BACKGROUND 0BInvestment Evaluatio
- Page 133 and 134: Date Scheme Outage duration of Prot
- Page 135 and 136: 0BInvestment Evaluation Summary TNM
- Page 137 and 138:
0BInvestment Evaluation Summary TNM
- Page 139 and 140:
INVESTMENT EVALUATION SUMMARY TITLE
- Page 141 and 142:
1 BACKGROUND 0BInvestment Evaluatio
- Page 143 and 144:
4.3 RISK EVALUATION 0BInvestment Ev
- Page 145:
0BInvestment Evaluation Summary TNM
- Page 148 and 149:
CONTENTS 0BInvestment Evaluation Su
- Page 150 and 151:
0BInvestment Evaluation Summary TNM
- Page 152 and 153:
7.1 MAINTAIN THE EXISTING ASSETS AN
- Page 154 and 155:
CONTENTS 0BInvestment Evaluation Su
- Page 156 and 157:
7. OPTIONS ANALYSIS The following v
- Page 158 and 159:
Burnie-Waratah 110 kV Transmission
- Page 160 and 161:
Burnie-Waratah 110 kV Transmission
- Page 162 and 163:
Burnie-Waratah 110 kV Transmission
- Page 164 and 165:
Burnie-Waratah 110 kV Transmission