6 BENEFITS<br />
The direct benefits of redeveloping Creek Road Substation 110 kV include:<br />
� contributing to the achievement of the <strong>capital</strong> <strong>expenditure</strong> objectives identified in the Rules;<br />
0BInvestment Evaluation Summary<br />
TNM-GS-809-0720<br />
� provision of a safe, secure and reliable electricity supply to customers connected to Creek Road Substation, in<br />
particular Hobart’s CBD by replacing obsolete, unreliable assets that are in poor condition;<br />
� life-cycle cost savings due to reduced operations and maintenance requirements;<br />
� reduced burden on spare parts management by using standard equipment; and<br />
� alignment with strategic asset management plans.<br />
7 OPTIONS ANALYSIS<br />
The following options have been considered for the redevelopment of Creek Road Substation:<br />
1. manage existing assets and defer replacement;<br />
2. replace assets in situ;<br />
3. staged replacement of assets in situ over three years;<br />
4. redevelop using air insulated switchgear;<br />
5. redevelop using gas insulated switchgear; and<br />
6. redevelop using hybrid switchgear.<br />
Other options considered at a high-level, but discounted for the reasons mentioned:<br />
� Off-site greenfield redevelopment - not considered to be a cost effective alternative as other solutions can be<br />
implemented within the existing perimeter of Creek Road Substation at a lower cost. This option has advantages<br />
over other options in terms of outage requirements, however the additional costs associated with purchasing new<br />
land and easement for deviation of transmission circuits outweigh the benefits of reduced outages.<br />
� Replace selected assets only - replacement of selected assets has already been undertaken in order to defer major<br />
works at Creek Road Substation. The need to replace the large number of assets that present safety, condition and<br />
performance issues means that combining the works as part of a major redevelopment is the most cost-effective<br />
solution.<br />
7.1 OPTION 1 - MANAGE EXISTING ASSETS AND DEFER REPLACEMENT<br />
7.1.1 SCOPE<br />
The scope for this option includes:<br />
� continue existing maintenance practices for the majority of assets, albeit accelerated due to the declining condition<br />
and aging of the assets;<br />
� replace assets that are known to present a significant safety risk, including voltage transformers, current<br />
transformers and post insulators in 2014;<br />
� replace identified disconnectors that do not provide the required electrical clearances for compliant operation at<br />
110 kV in 2014;<br />
� replace the SCADA and bus bar protection scheme in 2014;<br />
� replace the underground 110 kV power cable that is in poor condition in 2014; and<br />
© <strong>Transend</strong> Networks Pty Ltd 10 of 17