24.02.2013 Views

Transend - Appendix 5 Renewal capital expenditure - Australian ...

Transend - Appendix 5 Renewal capital expenditure - Australian ...

Transend - Appendix 5 Renewal capital expenditure - Australian ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 3 - Summary of NPV cost analysis<br />

0BInvestment Evaluation Summary<br />

TNM-GS-809-0720<br />

Option Net present value of costs ($M June 2007)<br />

1 Maintain the existing assets and defer replacement 2.45<br />

2 Replacement of assets but defer duplication of protection schemes 2.92<br />

3 Replacement of assets and duplicate 2.25<br />

9. PREFERRED OPTION<br />

Option three is the preferred option because it addresses all of the identified investment drivers and performance issues at<br />

the lowest NPV cost.<br />

© <strong>Transend</strong> Networks Pty Ltd 10 of 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!