1 BACKGROUND<br />
0BInvestment Evaluation Summary<br />
TNM-GS-809-0720<br />
Knights Road Substation is connected to the transmission network via the Chapel Street–Knights Road–Electrona and<br />
Knights Road–Electrona 110 kV transmission lines. Knights Road Substation supplies Kermandie and Huon River<br />
Substations at 110 kV and Aurora Energy at 11 kV. The combined load at Huon River, Kermandie and Knights Road<br />
substations exceeded 25 MW in winter 2008.<br />
The majority of the 110 kV assets in service at Knights Road Substation were installed when the substation was<br />
commissioned in 1962. A new 110/11 kV connection site was established at Knights Road Substation in 1987.<br />
Figure 1 presents the schematic diagram of the Huon area transmission network that connects to Knights Road<br />
Substation.<br />
Figure 1 – Huon area transmission network schematic diagram<br />
2 PROJECT OVERVIEW<br />
The works at Knights Road Substation include the replacement of selected 110 kV switch bays and protection and<br />
control systems associated with the 110 kV and 11 kV systems. In particular, this project includes the following works:<br />
� replacement of Reyrolle type 110/OS/10 110 kV circuit breakers;<br />
� replacement of Asea type EMFA 120 110 kV voltage transformers;<br />
� installation of 110 kV voltage transformers on each transmission line;<br />
� replacement of girder-mounted disconnectors with pedestal mounted units;<br />
� replacement of multi-piece post insulators;<br />
� replacement of the protection scheme on the Knights Road–Huon River–Kermandie 110 kV transmission line;<br />
� replacement of the 110 kV bus bar protection scheme;<br />
� replacement of the protection scheme associated with the 110 kV bus coupler circuit breaker;<br />
� replacement of the protection schemes associated with transformers T1 and T2;<br />
� replacement of the protection schemes associated with feeder bays and 11 kV bus bars; and<br />
� replacement of the substation supervisory control and data acquisition (SCADA).<br />
© <strong>Transend</strong> Networks Pty Ltd 3 of 13