CONTENTS<br />

Burnie-Waratah 110 kV Transmission Line Wood Poles<br />

TNM-CR-808-0888<br />

Issue 1.0, November 2008<br />

EXECUTIVE SUMMARY 4<br />

1 BACKGROUND 5<br />

2 ASSET ASSESSMENT 5<br />

2.1 Reliability 6<br />

2.2 Physical condition 6<br />

2.3 Maintenance 7<br />

2.4 Spare parts and contingency planning 8<br />

2.5 Safety 8<br />

2.6 Environment 8<br />

3 ASSET MANAGEMENT OPTIONS 8<br />

4 FUTURE MANAGEMENT STRATEGY 9<br />

LIST OF FIGURES<br />

Figure 1 – Wood pole age profile 5<br />

Figure 2 – Actual wood pole failure rate vs. HEC/Aurora historical and estimated failure rate 6<br />

Figure 3 – Treated wood pole with fungal degradation 9 metres above ground line. 7<br />

© <strong>Transend</strong> Networks Pty Ltd Page 3 of 9<br />

UNCONTROLLED WHEN PRINTED