� improves the operational flexibility of the site;<br />

� reduces the overall footprint of the site;<br />

� allows for future expansion of the site; and<br />

� allows for rationalisation of auxiliary equipment.<br />

7.4.3 DRAWBACKS<br />

The drawbacks for this option are that the:<br />

� double-bus bar option is difficult to achieve given site constraints and outage management issues;<br />

0BInvestment Evaluation Summary<br />

TNM-GS-809-0720<br />

� additional temporary works required during implementation to maintain secure and reliable supply at Creek Road<br />

Substation and remote sites; and<br />

� increased risks presented during implementation work within a constrained site.<br />

7.4.4 CONCLUSION<br />

This option is technically viable.<br />

7.5 OPTION 5 - REDEVELOP USING GAS INSULATED SWITCHGEAR<br />

7.5.1 SCOPE<br />

This option includes the replacement, rationalisation and reconfiguration of 110 kV assets at Creek Road Substation<br />

using gas-insulated switchgear (GIS). This option includes redeveloping the site using a double bus arrangement as<br />

presented in Figure 3.<br />

Figure 3 – Option 4: single line diagram (GIS)<br />

CR-NH #1<br />

NN-CR CS-CR #1<br />

T2<br />

X X<br />

X<br />

X<br />

T3 CS-CR #2<br />

X X B/C X X B/C X X B/C X X<br />

Cap Bank 1<br />

(Future)<br />

Cap Bank 2<br />

(Future)<br />

CS-CR-RI<br />

© <strong>Transend</strong> Networks Pty Ltd 15 of 17<br />

X<br />

CS-NH #2<br />

X X<br />

CR-RI<br />

T4