0BInvestment Evaluation Summary<br />
TNM-GS-809-0720<br />
The economic analysis includes the cost impact to customers in the event of a major circuit breaker failure using a<br />
probabilistic approach based on current and forecast load data for each individual transmission circuit connected to<br />
Knights Road Substation 110 kV.<br />
9 PREFERRED OPTION<br />
Option 2 (replace selected assets in-situ) is the least cost option that addresses the identified safety, reliability, condition<br />
and design issues at Knights Road Substation. This option also minimise the number and duration of transmission circuit<br />
outages due to reduced frequency and duration of maintenance.<br />
Further detailed analysis will be undertaken during the project initiation process to ensure that the information and<br />
assumptions which have been used to identify the preferred option are still valid.<br />
© <strong>Transend</strong> Networks Pty Ltd 13 of 13