0BInvestment Evaluation Summary<br />

TNM-GS-809-0720<br />

7.4 OPTION 4: COMPLETE REDEVELOPMENT OF KNIGHTS ROAD SUBSTATION<br />

110 KV<br />

7.4.1 SCOPE<br />

The scope for this option includes:<br />

� in-situ replacement of the existing live tank circuit breakers with dead tank units with integral current transformers;<br />

� replacement of 110 kV disconnectors in situ;<br />

� replacement of gantry structures;<br />

� replacement of protection and control schemes; and<br />

� implement revised maintenance practices.<br />

The <strong>capital</strong> cost of this option is $8.58 million ($June 2007).<br />

7.4.2 BENEFITS<br />

The benefits for this option are that it:<br />

� would allow <strong>Transend</strong> to achieve the <strong>capital</strong> <strong>expenditure</strong> objectives;<br />

� addresses the asset and safety issues associated with the 110 kV assets identified in section 4, in particular the<br />

110 kV voltage transformers and post insulators;<br />

� addresses other performance, reliability and design issues identified in section 4; and<br />

� reduces the ongoing maintenance requirements and costs associated with the site.<br />

7.4.3 DRAWBACKS<br />

The option has the following drawbacks:<br />

� higher <strong>capital</strong> cost than option 2.<br />

7.4.4 CONCLUSION<br />

This option is technically viable.<br />

8 OPTION ESTIMATES<br />

A comparison of the net present value of options is provided in Table 2.<br />

Table 2 - Comparison of options considered<br />

Option<br />

Net present value of costs ($M June 2007)<br />

1 Manage existing assets and defer replacement -$5.21<br />

2 Replace selected assets in-situ -$4.71<br />

3 Staged replacement of selected assets in-situ -$4.87<br />

4 Complete redevelopment of Knights Road Substation 110 kV -$5.23<br />