7.3.3 DRAWBACKS<br />

The drawbacks for this option are that it:<br />

� results in a higher initial <strong>capital</strong> cost than option 1;<br />

0BInvestment Evaluation Summary<br />

TNM-GS-809-0720<br />

� results in a higher overall <strong>capital</strong> cost than option 2, primarily due to contractor remobilisation and increased internal<br />

costs;<br />

� does not align with <strong>Transend</strong>’s policy to utilise dead tank circuit breakers when replacing 110 kV live tank current<br />

transformers and circuit breakers for two 110 kV bays;<br />

� it does not address the operational issues associated with the ring bus arrangement identified in Section 4;<br />

� reduced efficiencies in project delivery;<br />

� will need additional transmission circuit outages to undertake the works; and<br />

� may have implications on future development at the site<br />

7.3.4 CONCLUSION<br />

This option is technically viable.<br />

7.4 OPTION 4 - REDEVELOP USING AIR INSULATED SWITCHGEAR<br />

7.4.1 SCOPE<br />

This option includes the replacement, rationalisation and reconfiguration of 110 kV assets at Creek Road Substation<br />

using air-insulated switchgear (AIS). This option includes redeveloping the site using a double bus arrangement as<br />

presented in Figure 2.<br />

© <strong>Transend</strong> Networks Pty Ltd 13 of 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!